A Life Cycle Assessment study of iron ore mining

被引:81
|
作者
Ferreira, Helio [1 ]
Praca Leite, Mariangela Garcia [1 ,2 ]
机构
[1] Univ Fed Ouro Preto, Escola Minas, Hydraul Lab, Postgrad Program Environm & Socioecon Sustainabil, Sao Paulo, Brazil
[2] Univ Fed Ouro Preto, Dept Geol, Sao Paulo, Brazil
关键词
Environment; Environmental management; Life Cycle Assessment; Mining; Iron ore; CRADLE-TO-GATE; MANAGEMENT; IMPACT;
D O I
10.1016/j.jclepro.2015.05.140
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
This paper assessed the cradle-to-gate life cycle of an iron ore mining. The study was based on production data from an open pit mine located in the Iron Quadrangle/Brazil. The functional unit was defined as "one tonne of iron ore concentrate produced" and the data used were collected directly from the company's production reports covering the time of one year. The evaluation included the classification and characterization of life cycle impacts, not including normalization and weighting as well as sensitivity analysis of results. The evaluation of impacts used SimaPro-7, Ecoinvent 2.0, Eco indicator'99 and IPCC 2007. The results indicated that the use of grinding media in the processes is the main source of environmental impacts in the iron ore production chain, highlighting its contribution to life cycle impacts on human health and quality of ecosystems. Ore transportation by conveyor belts powered by electricity was more efficient in relation to the generation of impacts on the abiotic resources depletion and on climate changes than ore transportation by diesel trucks because the electricity generation matrix in Brazil has significant participation from hydroelectric plants. (C) 2015 Elsevier Ltd. All rights reserved.
引用
收藏
页码:1081 / 1091
页数:11
相关论文
共 50 条
  • [41] An accumulative model for the comparative life cycle assessment case study: Iron and steel process
    Li, GQ
    Nie, ZR
    Zhou, HM
    Di, XH
    Liu, YX
    Zuo, TY
    INTERNATIONAL JOURNAL OF LIFE CYCLE ASSESSMENT, 2002, 7 (04): : 225 - 229
  • [42] An accumulative model for the comparative life cycle assessment case study: iron and steel process
    Guiqi Li
    Zuoren Nie
    Hemin Zhou
    Xianghua Di
    Yexiang Liu
    Tieyong Zuo
    The International Journal of Life Cycle Assessment, 2002, 7 : 225 - 229
  • [43] Assessing WELBY Social Life Cycle Assessment Approach through Cobalt Mining Case Study
    Orola, Anni
    Harri, Anna
    Levanen, Jarkko
    Uusitalo, Ville
    Olsen, Stig Irving
    SUSTAINABILITY, 2022, 14 (18)
  • [44] Study on integrated method of life cycle assessment and life cycle costing
    State Key Laboratory of Digital Manufacturing Equipment and Technology, Huazhong University of Science and Technology, Wuhan 430074, China
    Zhongguo Jixie Gongcheng, 2007, 15 (1804-1809):
  • [45] A Case Study by Life Cycle Assessment
    Li, Shuyun
    MATERIALS SCIENCE, ENERGY TECHNOLOGY, AND POWER ENGINEERING I, 2017, 1839
  • [46] PLANS FOR MINING IRON ORE IN LIBYA.
    Aly, Mahmoud K.
    Mining Magazine, 1981, 144 (04): : 320 - 322
  • [47] Opencast to underground iron ore mining method
    Fan Xiao-ming
    Ren Feng-yu
    Xiao Dong
    Mao Ya-chun
    JOURNAL OF CENTRAL SOUTH UNIVERSITY, 2018, 25 (07) : 1813 - 1824
  • [48] Development potential of the iron ore mining industry
    Wens, Herman G.
    Stahl und Eisen, 1999, 119 (02): : 61 - 68
  • [49] Improving Efficiency in Iron Ore Mining Facilities
    Wiechmann, Eduardo P.
    Aqueveque, Pablo E.
    Morales, Anibal S.
    2008 IEEE INDUSTRY APPLICATIONS SOCIETY ANNUAL MEETING, VOLS 1-5, 2008, : 2009 - 2014
  • [50] IRON-ORE MINING - ASSESSING MORBIDITY
    FIELD, GB
    MEDICAL JOURNAL OF AUSTRALIA, 1985, 143 (02) : 68 - 69