PERFORMANCE OF GAS PHASE FILTERS - FULL SCALE TEST FACILITY

被引:0
|
作者
Haghighat, Fariborz [1 ]
Bastani, Arash [1 ]
Lee, Chang-Seo
Lakdawala, Ness
Flaherty, Chris
机构
[1] Concordia Univ, Dept Bldg Civil & Environm Engn, Montreal, PQ H3G 1M8, Canada
关键词
Ventilation; Air purification; Filtration; Activated charcoal carbon; Testing;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Improving indoor air quality (IAQ) has received considerable attention over the past few decades. Applying air cleaning devices to filter particulates and gaseous contaminants is an effective way to reduce the contaminant levels and have a positive influence on the IAQ. Also, from an energy perspective, this method can be more efficient than diluting the indoor air with excessive outdoor air under certain conditions, i.e., contaminated outdoor air, hot and humid or extremely cold weathers. However, there is a lack of an acceptable approach to evaluate the performance of complete gaseous filtering systems for building applications. A full scale test facility was designed and constructed to investigate the removal effectiveness of commercial gas-phase air cleaning devices. The test rig was verified by conducting the system pre-qualification tests similar to those of ASHRAE standard 52.2. The tests were designed to quantitatively verify the reliability of the test rig for gas filter testing like velocity uniformity, uniform dispersion of challenge contaminants, temperature and humidity control. As a final validation, a commercial gas filter was tested for toluene removal. This paper presents the details of the design and prequalification tests of the developed test rig as well as the experimental results of a v-shape module filled with a coconut shell-based granular activated carbon.
引用
收藏
页码:1015 / 1022
页数:8
相关论文
共 50 条
  • [41] Operation of the first full scale road test facility in Korea and lessons learned from 8 years of experience
    Seo, Youngguk
    Kim, Seong-Min
    Lee, Jae-Hoon
    KSCE JOURNAL OF CIVIL ENGINEERING, 2013, 17 (05) : 1023 - 1029
  • [42] Case study of a full-scale load test of a piled raft with an interposed layer for a nuclear storage facility
    Mattsson, N.
    Menoret, A.
    Simon, C.
    Ray, M.
    GEOTECHNIQUE, 2013, 63 (11): : 965 - 976
  • [43] Test facility for drill bit performance
    Ersoy, A
    Waller, MD
    INDUSTRIAL DIAMOND REVIEW, 1999, 59 (04): : 297 - +
  • [44] Full-Scale Tests of Unbonded PCC Overlays at the FAA's National Airport Pavement Test Facility
    Ahmed, M. U.
    Yin, H.
    Brill, D. R.
    AIRFIELD AND HIGHWAY PAVEMENTS 2019: INNOVATION AND SUSTAINABILITY IN HIGHWAY AND AIRFIELD PAVEMENT TECHNOLOGY, 2019, : 394 - 406
  • [45] Full-scale shaking table test of a base-isolated medical facility subjected to vertical motions
    Furukawa, Sachi
    Sato, Eiji
    Shi, Yundong
    Becker, Tracy
    Nakashima, Masayoshi
    EARTHQUAKE ENGINEERING & STRUCTURAL DYNAMICS, 2013, 42 (13): : 1931 - 1949
  • [46] DEVELOPMENT OF A THERMAL-HYDRAULIC TEST FACILITY FOR FULL-SCALE LMFBR STEAM-GENERATOR TUBES
    STEVENS, HC
    FRANCE, DM
    TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1975, 22 (NOV16): : 538 - 540
  • [47] Instrumenting full-scale Boron Injection Test Facility to support Atucha-2 NPP licensing
    Moretti, Fabio
    Terzuoli, Fulvio
    D'Auria, Francesco
    Mazzantini, Oscar
    NUCLEAR ENGINEERING AND DESIGN, 2018, 336 : 154 - 162
  • [48] Test facility for drill bit performance
    Waller, Martin D.
    Ersoy, Adem
    Industrial Diamond Review, 1999, 59 (583): : 297 - 301
  • [49] Full scale test facility for operability verification of tokamak pressure suppression system at sub-atmospheric conditions
    Pesetti, A.
    Raucci, M.
    Giambartolomei, G.
    Marini, A.
    Sarkar, B.
    Olcese, M.
    Aquaro, D.
    FUSION ENGINEERING AND DESIGN, 2021, 168
  • [50] INTEGRATED WET GAS COMPRESSOR TEST FACILITY
    Hundseid, Olyvind
    Bakken, Lars E.
    PROCEEDINGS OF THE ASME TURBO EXPO: TURBINE TECHNICAL CONFERENCE AND EXPOSITION, 2015, VOL 9, 2015,