Risk assessment of vendors in supply chain management based on unascertained theory

被引:0
|
作者
Liu, Jun'e [1 ]
Ma, Xintao [2 ]
Liu, Yongsheng [3 ]
机构
[1] Beijing Wuzi Univ, Sch Informat, Beijing 101149, Peoples R China
[2] Hebei Univ Engn, Sch Econ Management, Handan 056038, Peoples R China
[3] Beijing Wuzi Univ, Sch Logist, Beijing 101149, Peoples R China
关键词
Unascertained theory; Supply chain management; Vendor option; Risk assessment;
D O I
暂无
中图分类号
F [经济];
学科分类号
02 ;
摘要
Risk assessment of suppliers is an important part to supply chain management and the foundation to run the partnership of supply chain. Many facts are important to guide the option of vendors in supply chain management, such as the specific analysis of the facts of supplier option; the goal to reduce the risk of supply chain, the model based on the unascertained theory of risk assessment and the procedure to example it.
引用
下载
收藏
页码:337 / 342
页数:6
相关论文
共 50 条
  • [1] Research on the innovation model of vendors assessment in supply chain management
    Sun Dapeng
    Ji Zhijian
    Su Jingqin
    PROCEEDINGS OF 2005 INTERNATIONAL CONFERENCE ON INNOVATION & MANAGEMENT, 2005, : 639 - 643
  • [2] The vendors role in supply chain management
    Griffin, Wm.R.
    Distribution Sales and Management, 2003, 44 (06): : 30 - 31
  • [3] Research on risk assessment of cruise tourism supply chain based on catastrophe theory
    Gan, Shengjun
    Liu, Qingliang
    PLOS ONE, 2024, 19 (08):
  • [4] Risk Assessment of Supply Chain Based on Combination Weighting Method and Grey Theory
    Yang, Linqiao
    Liang, Xuedong
    Deng, Fumin
    Guo, Zhaoxia
    2015 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2015, : 895 - 899
  • [5] Green Supply Chain Performance Based on Unascertained Means Cluster
    Yin, Zongcheng
    Ren, Xiangyang
    2009 IEEE 16TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1 AND 2, PROCEEDINGS, 2009, : 1511 - +
  • [6] Risk assessment of gas disaster in tunnel construction based on unascertained measurement theory
    Zhai, Qiang
    Gu, Weihong
    Zhao, Yingying
    Journal of Railway Science and Engineering, 2021, 18 (03) : 803 - 812
  • [7] Landslide risk assessment based on combination weighting-unascertained measure theory
    Li Jun-xia
    Wang Chang-ming
    Wang Gang-cheng
    ROCK AND SOIL MECHANICS, 2013, 34 (02) : 468 - 474
  • [8] The Risk Assessment for Supply Chain Based on ANP
    Wang, Pu
    Cui, Li-rong
    PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE ON RISK AND RELIABILITY MANAGEMENT, VOLS I AND II, 2008, : 437 - 439
  • [9] BOM based supply chain risk management
    Takata, Shozo
    Yamanaka, Masato
    CIRP ANNALS-MANUFACTURING TECHNOLOGY, 2013, 62 (01) : 479 - 482
  • [10] Based on the system theory the construction supply chain management
    Mu, Shenyun
    Du, Zhaohui
    Fu, Maopu
    PROCEEDINGS OF 2007 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2007, : 885 - 890