Application of Fuzzy Modelling to Predict Construction Projects Cash Flow

被引:22
|
作者
Tabei, Sayed Mohammad Amin [1 ]
Bagherpour, Morteza [2 ]
Mahmoudi, Amin [3 ]
机构
[1] Univ Econ Sci, Dept Financial Engn, Tehran, Iran
[2] Iran Univ Sci & Technol, Dept Ind Engn, Tehran, Iran
[3] Islamic Azad Univ, Dept Ind Engn, Shiraz Branch, Shiraz, Iran
来源
关键词
cash flow; fuzzy sets; predict cash flow; project management; construction projects; COST; TIME; OPTIMIZATION; SENSITIVITY; INVESTMENT; MANAGEMENT; DURATION; QUALITY; RISK;
D O I
10.3311/PPci.13402
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Construction project managers are always looking for methods for forecasting future projects and preventing of potential delays in the project. One of the most crucial requirements of construction project managers and financial planners is awareness of project cash flow and financial status. On the other hand, the unique properties of construction projects with uncertainties such as activity duration, the variability of resources, material costs and also ambiguity in the employer's payments are factors that have an effect on the correct prediction of project cash flow. Hence, the project team should examine project cash flow under uncertainty environment. There are many approaches for considering uncertainty such as fuzzy sets, interval theory, rough and grey system. But the most well-known approach is fuzzy sets which has wide applications in engineering and management. Hence in this paper, we proposed a new method for forecasting project cash flow under fuzzy environment. Finally, the proposed method was applied on an "Engineering, Procurement and Construction"(EPC) project and it is demonstrated that the proposed model has a high performance in the prediction of project cash flow.
引用
收藏
页码:647 / 659
页数:13
相关论文
共 50 条
  • [31] ECONOMIC ASSESSMENT OF PROJECTS USING DISCOUNTED CASH FLOW
    ALLEN, DH
    [J]. TRANSACTIONS OF THE INSTITUTION OF CHEMICAL ENGINEERS AND THE CHEMICAL ENGINEER, 1968, 46 (02): : CE29 - &
  • [32] On a fuzzy cash flow model with insurance applications
    Ungureanu D.
    Vernic R.
    [J]. Decisions in Economics and Finance, 2015, 38 (1) : 39 - 54
  • [33] Developing a novel cash flow risk analysis framework for construction projects based on 5D BIM
    Ranjbar, Alireza Amin
    Ansari, Ramin
    Taherkhani, Roohollah
    Hosseini, M. Reza
    [J]. JOURNAL OF BUILDING ENGINEERING, 2021, 44
  • [34] CONSTRUCTION CASH FLOW MANAGEMENT-SYSTEM
    REINSCHMIDT, KF
    FRANK, WE
    [J]. JOURNAL OF THE CONSTRUCTION DIVISION-ASCE, 1976, 102 (04): : 615 - 627
  • [35] CASH FLOW BUILDS AS CONSTRUCTION WINDS DOWN
    CAVANAUGH, HA
    [J]. ELECTRICAL WORLD, 1983, 197 (10): : 39 - 46
  • [36] PREDICTION AND CONTROL OF CASH FLOW FOR A CONSTRUCTION PROJECT
    THOMPSON, PA
    [J]. ENGINEERING AND PROCESS ECONOMICS, 1976, 1 (04): : 265 - 271
  • [37] Modelling IT projects success with fuzzy cognitive maps
    Rodriguez-Repiso, Luis
    Setchi, Rossitza
    Salmeron, Jose L.
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2007, 32 (02) : 543 - 559
  • [38] FUZZY ESTIMATION OF ACTIVITIES DURATION IN CONSTRUCTION PROJECTS
    Ibadov, N.
    [J]. ARCHIVES OF CIVIL ENGINEERING, 2015, 61 (02) : 23 - 34
  • [39] Fuzzy procurement selection model for construction projects
    Chan, Caroline T. W.
    [J]. CONSTRUCTION MANAGEMENT AND ECONOMICS, 2007, 25 (06) : 611 - 618
  • [40] FUZZY MODELING OF RISKS IN INVESTMENT AND CONSTRUCTION PROJECTS
    Glushenko, Sergey A.
    Doljenko, Alexey I.
    [J]. BIZNES INFORMATIKA-BUSINESS INFORMATICS, 2015, 32 (02): : 48 - 58