BOG Ventilation and Combustion in Re-liquefaction Plants of LNG Carriers

被引:0
|
作者
Cheng, Xin [1 ]
Rahman, Azizur [2 ]
机构
[1] Univ Calgary, Schulich Sch Engn, Calgary, AB, Canada
[2] Mem Univ Newfoundland, Fac Engn & Appl Sci, St John, NF A1B 3X5, Canada
来源
关键词
Liquefied Natural Gas (LNG) Carrier; Boil-off Gas (BOG); Safety; Re-liquefaction Plant; CFD;
D O I
暂无
中图分类号
U6 [水路运输]; P75 [海洋工程];
学科分类号
0814 ; 081505 ; 0824 ; 082401 ;
摘要
A liquefied natural gas (LNG) carrier is designed to transport LNG over a long distance. During transportation, the leakage of boil-off gas (BOG) along with poor ventilation can pose an explosion risk. The traditional method for dealing with the BOG is to burn the gas to power the ship. As an alternative method, re-liquefaction plants on board re-liquefy the vapours back to the cargo tanks. This project will characterize the technical issues associated with fire protection in a confined space where LNG boil-off re-liquefaction takes place and will demonstrate what the appropriate ventilation rate in an emergency is. In addition, the CFD software (ANSYS CFX) is applied to simulate the ventilation and burning of boil-off gas in the on board re-liquefaction plant to ensure the safety of the cargo tanks for the worst case scenario. The traditional method for dealing with the boil-off gas (BOG) on board an LNG carrier is to burn the gas to power the ship. As an alternative method, re-liquefaction plants on board re-liquefy the vapour back to the cargo tanks [1]. In the last few years, the introduction of LNG re-liquefaction systems has given ship owners a choice of fuels and provides engine redundancy. Nevertheless, flammable natural gas is processed in both methods. Due to the inherent properties of a ship's structure, the re-liquefaction system, gas combustion unit, pipelines, etc. are located in the space enclosed under the deck. Under certain circumstances the leakage of natural gas, along with poor ventilation, can pose an explosion risk. Unfortunately, limited industry codes have been developed for fire protection in the cabin where the innovative LNG re-liquefaction system is located. The purpose of this project is to demonstrate the leaking and burning of boil-off gas in the on board re-liquefaction plant to ensure the safety of the cargo tanks for the worst case scenario by using CFD simulation software.
引用
收藏
页数:7
相关论文
共 50 条
  • [31] Operability study on small-scale BOG (boil-off gas) re-liquefaction processes
    Son, Hyunsoo
    Kim, Jin-Kul
    ENERGY, 2019, 185 : 1263 - 1281
  • [32] Thermoeconomic optimization of a cryogenic refrigeration cycle for re-liquefaction of the LNG boil-off gas
    Sayyaadi, Hoseyn
    Babaelahi, M.
    INTERNATIONAL JOURNAL OF REFRIGERATION-REVUE INTERNATIONALE DU FROID, 2010, 33 (06): : 1197 - 1207
  • [33] Fabric characteristics and processes influencing the liquefaction and re-liquefaction of sand
    Wang, Rui
    Fu, Pengcheng
    Zhang, Jian-Min
    Dafalias, Yannis F.
    SOIL DYNAMICS AND EARTHQUAKE ENGINEERING, 2019, 125
  • [34] Numerical simulation of an ethylene re-liquefaction plant
    Berlinck, EC
    Parise, JAR
    Marques, RP
    INTERNATIONAL JOURNAL OF ENERGY RESEARCH, 1997, 21 (07) : 597 - 614
  • [35] Design of BOG re-liquefaction system of 20,000 m3 liquid hydrogen carrier
    Byeon, Byeongchang
    You, Hwalong
    Kim, Dongmin
    Lee, Keun Tae
    Kim, Mo Se
    Kim, Gi Dock
    Kim, Jung Hun
    Lee, Sang Yoon
    Koh, Deuk Yong
    PROGRESS IN SUPERCONDUCTIVITY AND CRYOGENICS, 2023, 25 (03): : 49 - 55
  • [36] Analysis and efficiency enhancement for energy-saving re-liquefaction processes of boil-off gas without external refrigeration cycle on LNG carriers
    Bian, Jiang
    Yang, Jian
    Liu, Yang
    Li, Yuxing
    Cao, Xuewen
    Energy, 2022, 239
  • [37] An Analysis of the Primary Energy Consumed by the Re-Liquefaction of Boil-Off Gas of LNG Storage Tank
    Liu, Shengchun
    Li, Xueqiang
    Huo, Yan
    Li, Hailin
    CLEAN, EFFICIENT AND AFFORDABLE ENERGY FOR A SUSTAINABLE FUTURE, 2015, 75 : 3315 - 3321
  • [38] Optimization and economic evaluation of carbon dioxide BOG Re-liquefaction process considering storage pressure and nitrogen impurity
    Jeong, Ijun
    Jeon, Yoonju
    Shin, Hongkyoung
    Lee, Jaejun
    Lim, Youngsub
    ENERGY, 2025, 323
  • [39] Analysis and efficiency enhancement for energy-saving re-liquefaction processes of boil-off gas without external refrigeration cycle on LNG carriers
    Bian, Jiang
    Yang, Jian
    Liu, Yang
    Li, Yuxing
    Cao, Xuewen
    ENERGY, 2022, 239
  • [40] Re-liquefaction resistance of lightly cemented sands
    Rasouli, Habib
    Fatahi, Behzad
    Nimbalkar, Sanjay
    CANADIAN GEOTECHNICAL JOURNAL, 2022, : 2085 - 2101