BOG Ventilation and Combustion in Re-liquefaction Plants of LNG Carriers

被引:0
|
作者
Cheng, Xin [1 ]
Rahman, Azizur [2 ]
机构
[1] Univ Calgary, Schulich Sch Engn, Calgary, AB, Canada
[2] Mem Univ Newfoundland, Fac Engn & Appl Sci, St John, NF A1B 3X5, Canada
来源
关键词
Liquefied Natural Gas (LNG) Carrier; Boil-off Gas (BOG); Safety; Re-liquefaction Plant; CFD;
D O I
暂无
中图分类号
U6 [水路运输]; P75 [海洋工程];
学科分类号
0814 ; 081505 ; 0824 ; 082401 ;
摘要
A liquefied natural gas (LNG) carrier is designed to transport LNG over a long distance. During transportation, the leakage of boil-off gas (BOG) along with poor ventilation can pose an explosion risk. The traditional method for dealing with the BOG is to burn the gas to power the ship. As an alternative method, re-liquefaction plants on board re-liquefy the vapours back to the cargo tanks. This project will characterize the technical issues associated with fire protection in a confined space where LNG boil-off re-liquefaction takes place and will demonstrate what the appropriate ventilation rate in an emergency is. In addition, the CFD software (ANSYS CFX) is applied to simulate the ventilation and burning of boil-off gas in the on board re-liquefaction plant to ensure the safety of the cargo tanks for the worst case scenario. The traditional method for dealing with the boil-off gas (BOG) on board an LNG carrier is to burn the gas to power the ship. As an alternative method, re-liquefaction plants on board re-liquefy the vapour back to the cargo tanks [1]. In the last few years, the introduction of LNG re-liquefaction systems has given ship owners a choice of fuels and provides engine redundancy. Nevertheless, flammable natural gas is processed in both methods. Due to the inherent properties of a ship's structure, the re-liquefaction system, gas combustion unit, pipelines, etc. are located in the space enclosed under the deck. Under certain circumstances the leakage of natural gas, along with poor ventilation, can pose an explosion risk. Unfortunately, limited industry codes have been developed for fire protection in the cabin where the innovative LNG re-liquefaction system is located. The purpose of this project is to demonstrate the leaking and burning of boil-off gas in the on board re-liquefaction plant to ensure the safety of the cargo tanks for the worst case scenario by using CFD simulation software.
引用
收藏
页数:7
相关论文
共 50 条
  • [1] Review of the design and optimization of BOG re-liquefaction process for LNG carriers
    Liu, Lesheng
    Guo, Ting
    Zhou, Yanyan
    Shen, Jiubing
    Jiang, Qingfeng
    Tong, Xing
    CRYOGENICS, 2024, 142
  • [2] Performance analysis of oxygen refrigerant in an LNG BOG re-liquefaction plant
    Beladjine, Boumedienne M.
    Ouadha, Ahmed
    Adjlout, Lahouari
    4TH INTERNATIONAL CONFERENCE ON AMBIENT SYSTEMS, NETWORKS AND TECHNOLOGIES (ANT 2013), THE 3RD INTERNATIONAL CONFERENCE ON SUSTAINABLE ENERGY INFORMATION TECHNOLOGY (SEIT-2013), 2013, 19 : 762 - 769
  • [3] Optimization and control strategy of BOG re-liquefaction process for LNG vessels
    Guo, Ting
    Liu, Lesheng
    Shen, Jiubing
    Jiang, Qingfeng
    Wu, Sichen
    Zhou, Yanyan
    Liu, Yi
    INTERNATIONAL JOURNAL OF REFRIGERATION, 2023, 153 : 253 - 265
  • [4] Review on the design and optimization of BOG re-liquefaction process in LNG ship
    Yin, Liang
    Ju, Yonglin
    ENERGY, 2022, 244
  • [5] Life cycle assessment for enhanced Re-liquefaction systems applied to LNG carriers; effectiveness of partial Re-liquefaction system
    Park, Taesoo
    So, Sunglack
    Jeong, Byongug
    Zhou, Peilin
    Lee, Jae-ung
    JOURNAL OF CLEANER PRODUCTION, 2021, 285
  • [6] Energy, economic and environmental analysis of a BOG re-liquefaction process for an LNG carrier
    Hwang, Chulmin
    Oh, Sungkyun
    Kim, Donghoi
    Gundersen, Truls
    Lim, Youngsub
    ENERGY REPORTS, 2022, 8 : 2351 - 2362
  • [7] The development and comparison of CO2 BOG re-liquefaction processes for LNG fueled CO2 carriers
    Yoo, Byeong-Yong
    ENERGY, 2017, 127 : 186 - 197
  • [8] Design and optimization of liquid nitrogen precooling BOG re-liquefaction process for LNG ships
    Liu, Lesheng
    Guo, Ting
    Kong, Xianglei
    Shen, Jiubing
    Jiang, Qingfeng
    Zhou, Yanyan
    Tong, Xing
    INTERNATIONAL JOURNAL OF REFRIGERATION, 2024, 159 : 134 - 146
  • [9] Small scale BOG re-liquefaction system in skid-mounted in LNG filling station
    Zhu, Tiejun
    Zhang, Hua
    Ju, Yonglin
    Yang, Chongwei
    Ruan, Weimin
    Hu, Jianying
    Chen, Shuai
    Li, Haibing
    Huagong Xuebao/CIESC Journal, 2015, 66 : 325 - 331
  • [10] Exergy analysis of an ethylene bog re-liquefaction system
    20171403535207
    (1) Département de Génie Maritime, Faculté de Génie Mécanique, Université des Sciences et de la Technologie Mohamed BOUDIAF d'Oran (USTO-MB), Oran El-Mnouar, Oran; 31000, Algeria, 1600, Chemours; Daikin Industries, Ltd.; Denso Corporation; et al.; Fuji Electric Co., Ltd.; Fujitsu General Limited (International Institute of Refrigeration):