Implementation Learning and Forgetting Curve to Scheduling in Garment Industry

被引:2
|
作者
Badri, Huda Muhamad [1 ]
Deros, Baba Md [1 ]
Syahri, M. [2 ]
Saleh, Chairul [3 ]
Fitria, Aninda [3 ]
机构
[1] Univ Kebangsaan Malaysia, Fac Engn & Build Environm, Bangi 43600, Malaysia
[2] Univ Islam Indonesia, Fac Ind Technol, Yogyakarta 55584, Indonesia
[3] Univ Pembangunan Nas Vet, Fac Ind Technol, Yogyakarta 55283, Indonesia
关键词
IMPROVEMENT; MODEL;
D O I
10.1088/1757-899X/114/1/012068
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The learning curve shows the relationship between time and the cumulative number of units produced which using the mathematical description on the performance of workers in performing repetitive works. The problems of this study is level differences in the labors performance before and after the break which affects the company's production scheduling. The study was conducted in the garment industry, which the aims is to predict the company production scheduling using the learning curve and forgetting curve. By implementing the learning curve and forgetting curve, this paper contributes in improving the labors performance that is in line with the increase in maximum output 3 hours productive before the break are 15 unit product with learning curve percentage in the company is 93.24%. Meanwhile, the forgetting curve improving maximum output 3 hours productive after the break are 11 unit product with the percentage of forgetting curve in the company is 92.96%. Then, the obtained 26 units product on the productive hours one working day is used as the basic for production scheduling.