Fatigue investigation of tubing string in high-yield curved wells

被引:6
|
作者
Guo, Xiaoqiang [1 ,2 ]
Liu, Jun [1 ]
Dai, Liming [2 ]
He, Yufa [3 ]
Huang, Liang [4 ]
Wang, Guorong [1 ]
Yu, Lei [1 ]
机构
[1] Southwest Petr Univ, Sch Mechatron Engn, Chengdu 610500, Peoples R China
[2] Univ Regina, Ind Syst Engn, Regina, SK S4S 0A2, Canada
[3] CNOOC Res Inst, Beijing 100028, Peoples R China
[4] CNOOC China Co Ltd, Zhanjiang Branch, Zhanjiang 524057, Peoples R China
基金
中国国家自然科学基金;
关键词
High-yield curved wells; Tubing string; Nonlinear vibration model; Fatigue experiment; Fatigue life; CANTILEVER; FAILURES; PIPE;
D O I
10.1016/j.jngse.2020.103688
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
In view of the fatigue failure of tubing string caused by fluid-induced vibration (FIV) in high-yield curved well, a nonlinear vibration model of tubing string is established using energy method and Hamilton principle, which considers the longitudinal/lateral coupling effect of tubing string and the nonlinear contact collision effect of tubing-casing and verified by a similar experiment of tubing vibration. The cumulative damage theory (Miner's Law) is used to establish the fatigue life prediction method of the tubing string in high-yield curved well combined with the stress response which was determined by the proposed vibration model and the S-N curve of the tubing material (13Cr-L80) which was measured by fatigue experiment. Based on that, the fatigue life of the tubing in two typical horizontal well and directional well was analyzed under different production rate (0.4-1.6 million square/day) and different tubing diameter (3.5-in and 4.5-in). The result shows that the most dangerous position of the tubing string appears between 3/4 position of the tubing string and the packer. The critical production rate of 4.5-in tubing string in horizontal well is 1.08 million square/day to satisfy the life requirements of gas reservoir tubing (20 years), and which is 0.45 million square/day in directional well. The fatigue life of 4.5-in tubing string is higher than that of 3.5-in tubing string in both horizontal and directional wells. The research results provide a theoretically sound guidance for designing and practically sound approach for effectively improving the service life of tubing string in high-yield curved wells.
引用
收藏
页数:15
相关论文
共 50 条
  • [31] Characteristics of sustained annular pressure and fluid distribution in high pressure and high temperature gas wells considering multiple leakage of tubing string
    Zhang, Bo
    Xu, Zhixiong
    Lu, Nu
    Liu, Hongtao
    Liu, Jiquan
    Hu, Zhiqiang
    Xie, Junfeng
    Wang, Kelin
    [J]. JOURNAL OF PETROLEUM SCIENCE AND ENGINEERING, 2021, 196
  • [32] Shock vibration response characteristic of perforating tubing string in ultra-deep wells
    Liu, Jun
    Jian, Yilin
    Chen, Yili
    Tang, Kai
    Ren, Guohui
    Chen, Jianbo
    [J]. GEOENERGY SCIENCE AND ENGINEERING, 2023, 228
  • [33] Investigation of unsaturated polyester composites reinforced by aspen high-yield pulp fibers
    Du, Yicheng
    Yan, Ning
    Kortschot, Mark T.
    [J]. POLYMER COMPOSITES, 2012, 33 (02) : 169 - 177
  • [34] Mechanical Behavior and Optimization of Tubing String with Expansion Joint during Fracturing in HTUHP Wells
    Mou, Yisheng
    Yang, Shangyu
    Han, Lihong
    Wang, Jianjun
    Lian, Zhanghua
    [J]. PROCESSES, 2022, 10 (06)
  • [35] Study on tubing string safety during perforation detonation in ultra-deep wells
    Guo, Ruifeng
    [J]. GEOSYSTEM ENGINEERING, 2024, 27 (04) : 160 - 170
  • [36] HIGH RISKS - AND REWARDS - HIGH-YIELD BONDS
    MILKEN, MR
    HERSHMAN, A
    [J]. DUNS REVIEW, 1977, 109 (06): : 121 - &
  • [37] Factors controlling high-yield coalbed methane vertical wells in the Fanzhuang Block, Southern Qinshui Basin
    Tao, Shu
    Tang, Dazhen
    Xu, Hao
    Gao, Lijun
    Fang, Yuan
    [J]. INTERNATIONAL JOURNAL OF COAL GEOLOGY, 2014, 134 : 38 - 45
  • [38] A water breakthrough warning system of high-yield wells in fracture-cavity reservoirs in Tahe Oilfield
    Luo Juan
    Lu Xinbian
    Long Xibin
    Wu Bo
    He Xinming
    Li Xinhua
    Wang Lei
    [J]. PETROLEUM EXPLORATION AND DEVELOPMENT, 2013, 40 (04) : 501 - 506
  • [39] HOW TO MEASURE YIELD - AND REFINE HIGH-YIELD PULP
    STEVENS, J
    [J]. PULP & PAPER-CANADA, 1974, 75 (MAR) : 15 - 15
  • [40] HIGH-YIELD BISULFITE - REFINING PRETREATMENT
    LEASK, RA
    MCDONALD, JR
    SHAW, AC
    [J]. AMERICAN PAPER INDUSTRY, 1974, 56 (04): : 27 - 27