Optimal Exploitation of a General Renewable Natural Resource under State and Delay Constraints

被引:0
|
作者
Gaigi, M'hamed [1 ]
Kharroubi, Idris [2 ]
Lim, Thomas [3 ]
机构
[1] Univ Tunis El Manar, Ecole Natl Ingenieurs Tunis LAMSIN, Tunis 2092, Tunisia
[2] Univ Paris, Sorbonne Univ, CNRS, Lab Probabil Stat & Modelisat LPSM, F-75005 Paris, France
[3] Ecole Natl Super Informat Ind & Entreprise, Lab Math & Modelisat Evry, CNRS UMR 8071, F-91037 Evry, France
关键词
impulse control; natural resource; optimal harvesting; execution delay; viscosity solutions; state constraints; IMPULSE CONTROL; LIQUIDITY RISK; INVESTMENT;
D O I
10.3390/math8112053
中图分类号
O1 [数学];
学科分类号
0701 ; 070101 ;
摘要
In this work, we study an optimization problem arising in the management of a natural resource over an infinite time horizon. The resource is assumed to evolve according to a logistic stochastic differential equation. The manager is allowed to harvest the resource and sell it at a stochastic market price modeled by a geometric Brownian process. We assume that there are delay constraints imposed on the decisions of the manager. More precisely, starting harvesting order and selling order are executed after a delay. By using the dynamic programming approach, we characterize the value function as the unique solution to an original partial differential equation. We complete our study with some numerical illustrations.
引用
收藏
页码:1 / 25
页数:25
相关论文
共 50 条
  • [31] Optimal digital redesign of hybrid cascaded input-delay systems under state and control constraints
    Chang, YP
    Tsai, JSH
    Shieh, LS
    [J]. IEEE TRANSACTIONS ON CIRCUITS AND SYSTEMS I-FUNDAMENTAL THEORY AND APPLICATIONS, 2002, 49 (09): : 1382 - 1392
  • [32] Optimal information storage in noisy synapses under resource constraints
    Varshney, Lav R.
    Sjostrom, Per Jesper
    Chklovskii, Dmitri B.
    [J]. NEURON, 2006, 52 (03) : 409 - 423
  • [33] On optimal design of timber columns under resource and implementation constraints
    Hart, SM
    Hart, ED
    [J]. APPLIED MATHEMATICAL MODELLING, 2004, 28 (08) : 751 - 768
  • [34] ALGORITHM FOR OPTIMAL PROJECT SCHEDULING UNDER MULTIPLE RESOURCE CONSTRAINTS
    DAVIS, EW
    HEIDORN, GE
    [J]. MANAGEMENT SCIENCE SERIES B-APPLICATION, 1971, 17 (12): : B803 - B816
  • [35] Optimal allocation of minimal & perfect repairs under resource constraints
    Cui, LR
    Kuo, W
    Loh, HT
    Xie, A
    [J]. IEEE TRANSACTIONS ON RELIABILITY, 2004, 53 (02) : 193 - 199
  • [36] Optimal Resource Allocation in Time-Varying Vehicular Networks with Delay Constraints
    Fan, Xiying
    Fu, Bin
    [J]. WIRELESS ALGORITHMS, SYSTEMS, AND APPLICATIONS, WASA 2021, PT II, 2021, 12938 : 390 - 401
  • [37] Optimal time-variant resource allocation for Internet servers with delay constraints
    Zhong, XL
    Xu, CZ
    Xu, MH
    Wei, JB
    [J]. RTAS 2005: 11TH IEEE REAL TIME AND EMBEDDED TECHNOLOGY AND APPLICATIONS SYMPOSIUM, PROCEEDINGS, 2005, : 22 - 31
  • [38] Efficient and Optimal Capital Accumulation under a Non Renewable Resource Constraint
    Amigues, Jean-Pierre
    Moreaux, Michel
    [J]. REVUE D ECONOMIE POLITIQUE, 2008, 118 (06): : 791 - 825
  • [39] Optimal circuit clustering for delay minimization under a more general delay model
    Sze, CN
    Wang, TC
    [J]. IEEE TRANSACTIONS ON COMPUTER-AIDED DESIGN OF INTEGRATED CIRCUITS AND SYSTEMS, 2003, 22 (05) : 646 - 652
  • [40] Optimally Managing a Stochastic Renewable Resource under General Economic Conditions
    McGough, Bruce
    Plantinga, Andrew J.
    Costello, Christopher
    [J]. B E JOURNAL OF ECONOMIC ANALYSIS & POLICY, 2009, 9 (01):