Optimal Exploitation of a General Renewable Natural Resource under State and Delay Constraints

被引:0
|
作者
Gaigi, M'hamed [1 ]
Kharroubi, Idris [2 ]
Lim, Thomas [3 ]
机构
[1] Univ Tunis El Manar, Ecole Natl Ingenieurs Tunis LAMSIN, Tunis 2092, Tunisia
[2] Univ Paris, Sorbonne Univ, CNRS, Lab Probabil Stat & Modelisat LPSM, F-75005 Paris, France
[3] Ecole Natl Super Informat Ind & Entreprise, Lab Math & Modelisat Evry, CNRS UMR 8071, F-91037 Evry, France
关键词
impulse control; natural resource; optimal harvesting; execution delay; viscosity solutions; state constraints; IMPULSE CONTROL; LIQUIDITY RISK; INVESTMENT;
D O I
10.3390/math8112053
中图分类号
O1 [数学];
学科分类号
0701 ; 070101 ;
摘要
In this work, we study an optimization problem arising in the management of a natural resource over an infinite time horizon. The resource is assumed to evolve according to a logistic stochastic differential equation. The manager is allowed to harvest the resource and sell it at a stochastic market price modeled by a geometric Brownian process. We assume that there are delay constraints imposed on the decisions of the manager. More precisely, starting harvesting order and selling order are executed after a delay. By using the dynamic programming approach, we characterize the value function as the unique solution to an original partial differential equation. We complete our study with some numerical illustrations.
引用
收藏
页码:1 / 25
页数:25
相关论文
共 50 条