Tunnel and shaft construction for the Pingston Hydro Project

被引:0
|
作者
Downing, B [1 ]
Vorvis, Z [1 ]
Rawlings, G [1 ]
Kemp, P [1 ]
机构
[1] Golder Associates, Burnaby, BC, Canada
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The Pingston Hydro Project is a 45 MW hydropower project developed by private sector power development companies. The project involves 3.5 km of low and high pressure tunnels, a 450 m shaft, and 1225 m of steel liner. The tunnels are at internal pressures up to 480 m head, and the gross head at the powerhouse is 590 m, making the head at this plant one of the highest in North America. The paper will discuss construction of the tunnels and shaft, in-situ stress testing and determination of the steel liner length, high pressure plug design and construction and related design and construction issues.
引用
收藏
页码:561 / 569
页数:9
相关论文
共 50 条
  • [41] Effects of the Regional Subsidence on Tunnel-Shaft Connections, Considering Different Construction Procedures
    Ramirez, Rodrigo Rodriguez
    Angeles, Marco Perez
    Guichard, Gabriel Auvinet
    GEOTECHNICAL ENGINEERING IN THE XXI CENTURY: LESSONS LEARNED AND FUTURE CHALLENGES, 2019, : 1345 - 1351
  • [42] Semmering Base Tunnel – Design and construction of the shaft head caverns under difficult conditions
    Wieland G.
    Prall K.
    Lenz G.
    Schachinger T.
    Gobiet G.
    2018, Ernst und Sohn (11): : 462 - 470
  • [43] Application of large-scale soundproof dome with double membrane to tunnel and shaft construction
    Ohgiya, T
    Kawasaki, T
    Yasuoka, T
    Yamamoto, T
    Goshima, H
    NORTH AMERICAN TUNNELING '98, 1998, : 181 - 188
  • [44] Study and analysis on construction of Pudong air shaft wind passage of Renmin Road tunnel
    Zhang, Zheng
    Wu, Xiao-Jian
    Yang, Zi-Song
    Feng, Hai-Tao
    Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2010, 32 (SUPPL. 1): : 415 - 419
  • [45] Analysis of Construction Risk Control Project for Shaft Close to Current Iron Tower
    Bo, Huaishi
    Liu, Huakuan
    ADVANCES IN CIVIL ENGINEERING AND ARCHITECTURE INNOVATION, PTS 1-6, 2012, 368-373 : 2264 - +
  • [46] Construction of the First Street Connector Tunnel as part of the Northeast Boundary Tunnel Project in Washington DC
    Giurgola, B.
    Azzara, F.
    Bonaiuti, F.
    Fuegenschuh, Norbert
    PROCEEDINGS OF THE ITA-AITES WORLD TUNNEL CONGRESS 2023, WTC 2023: Expanding Underground-Knowledge and Passion to Make a Positive Impact on the World, 2023, : 1914 - 1922
  • [47] Hydro tunnel contracting challenges
    Wagner, H.
    UNDERGROUND - THE WAY TO THE FUTURE, 2013, : 1843 - 1849
  • [48] Variable fuzzy evaluation method for analysis of the stability of surrounding rock in diversion tunnel of hydro project
    Chen, Shou-Yu
    Hu, Ji-Min
    Li, Min
    Beijing Gongye Daxue Xuebao / Journal of Beijing University of Technology, 2009, 35 (04): : 464 - 469
  • [49] Technology for tunnel construction with special applications for Wanjiazhai Water Transfer Project
    Gunaratnam, DJ
    TUNNEL BORING MACHINES: TRENDS IN DESIGN & CONSTRUCTION OF MECHANIZED TUNNELLING, 1996, : 147 - 152
  • [50] Window sound proofing for construction noise at the central artery/tunnel project
    Fistel, M
    Thalheimer, E
    INTER-NOISE 99: PROCEEDINGS OF THE 1999 INTERNATIONAL CONGRESS ON NOISE CONTROL ENGINEERING, VOLS 1-3, 1999, : 31 - 36