Tunnel and shaft construction for the Pingston Hydro Project

被引:0
|
作者
Downing, B [1 ]
Vorvis, Z [1 ]
Rawlings, G [1 ]
Kemp, P [1 ]
机构
[1] Golder Associates, Burnaby, BC, Canada
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The Pingston Hydro Project is a 45 MW hydropower project developed by private sector power development companies. The project involves 3.5 km of low and high pressure tunnels, a 450 m shaft, and 1225 m of steel liner. The tunnels are at internal pressures up to 480 m head, and the gross head at the powerhouse is 590 m, making the head at this plant one of the highest in North America. The paper will discuss construction of the tunnels and shaft, in-situ stress testing and determination of the steel liner length, high pressure plug design and construction and related design and construction issues.
引用
收藏
页码:561 / 569
页数:9
相关论文
共 50 条
  • [1] Tunnel and shaft construction at the Wahleach Hydroelectric Project
    Ripley, B.
    Canadian Geotechnical Conference, 1992, : 1 - 104
  • [2] Approach on shaft-horizontal tunnel transport way in Shuibuya hydro project
    Tong, Shuquan
    Changsha Tiedao Xuyuan Xuebao/Journal of Changsha Railway University, 2000, 18 (01): : 108 - 112
  • [3] Design and construction of tunnel and shaft plugs
    Marold, James W.
    Kolenda, Peter
    NORTH AMERICAN TUNNELING 2008, PROCEEDINGS, 2008, : 334 - 344
  • [4] A SIMULATION TEMPLATE FOR MODELING TUNNEL SHAFT CONSTRUCTION
    Zhou, Fangyi
    AbouRizk, Simaan M.
    Fernando, Siri
    2008 WINTER SIMULATION CONFERENCE, VOLS 1-5, 2008, : 2455 - +
  • [5] Tunnel construction in hydro projects: The use of TBMs
    Grandori, R.
    International Journal on Hydropower and Dams, 2007, 14 (06): : 85 - 88
  • [6] Shaft sinking on the MetroWest Water Supply Tunnel Project
    Critchfield, JW
    Stewart, AJ
    Guay, M
    Hoddeson, AP
    1999 RAPID EXCAVATION AND TUNNELING CONFERENCE, PROCEEDINGS, 1999, : 735 - 751
  • [7] Intake shaft construction on the Lake Mead Project
    Ishii, D
    Morris, J
    1999 RAPID EXCAVATION AND TUNNELING CONFERENCE, PROCEEDINGS, 1999, : 761 - 767
  • [8] CONSTRUCTION OF TUNNEL SHAFT THROUGH LAKE DEPOSITS.
    Tyagi, G.D.
    Sharma, Kultar S.
    Indian Concrete Journal, 1984, 58 (05): : 119 - 123
  • [9] DESIGN AND CONSTRUCTION OF THE LENIHAN DAM OUTLET TUNNEL AND SHAFT
    Desai, Hemang
    Mainer, Brett
    Murray, Mike
    Spreng, Shawn
    2009 RAPID EXCAVATION AND TUNNELING CONFERENCE, PROCEEDINGS, 2009, : 171 - +
  • [10] PRINCIPLES OF ESTIMATING HARD ROCK TUNNEL AND SHAFT CONSTRUCTION
    GAGETTA, JD
    AACE BULLETIN, 1970, 12 (02): : 46 - &