Application Analysis of Comprehensive Advanced Geological Prediction in Karst Tunnel

被引:2
|
作者
Wang, Chengliang [1 ]
Bai, Mingzhou [1 ]
Du, Yanqing [1 ]
Kuang, Xing [1 ]
机构
[1] Beijing Jiaotong Univ, Sch Civil Engn, Beijing 100044, Peoples R China
关键词
comprehensive advanced geological prediction; karst tunnel; geo-analysis; geophysical probing technique;
D O I
10.4028/www.scientific.net/AMM.405-408.1309
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Based on the DaDu mountain tunnel of new construction ShangHai-KunMing high-speed railway, combine with field geology investigation of the tunnel address area comparative analysis TRT advanced geological prediction, infrared probe water, ground penetrating radar advance geological forecasting and tunnel design data, aimed at fault fracture zone, high-pressure water-rich belt, the karst fissures developmental situation may have in construction period of DaDu mountain tunnel, carried out the comprehensive advanced geological prediction and then combined with the actual excavation situation contrast and verify the feasibility and practicality of the comprehensive geological advanced prediction technology, and it will have important significance of reference for the similar tunnel project in design and construction period.
引用
收藏
页码:1309 / 1313
页数:5
相关论文
共 50 条
  • [21] Comprehensive technique of geological prediction and its applications in tunnel excavation
    Wu, Zhangzhong
    Xu, Guangli
    Wu, Li
    Shi, Xuantao
    [J]. Geophysical Solutions for Environment and Engineering, Vol 1 and 2, 2006, : 792 - 796
  • [22] The Advanced Geological Prediction Technology of Tunnel with the Geological Radar and Acoustic Detection Technology
    Xin, Youyang
    [J]. AGRO FOOD INDUSTRY HI-TECH, 2017, 28 (01): : 3507 - 3511
  • [23] RESEARCH OF GEOLOGICAL HAZARDS COMPREHENSIVE ASSESSMENT IN KARST TUNNEL BASED ON FUZZY EVALUATION METHOD
    Kuang, Xing
    Bai, Mingzhou
    Wang, Chengliang
    [J]. KEY TECHNOLOGIES OF RAILWAY ENGINEERING - HIGH SPEED RAILWAY, HEAVY HAUL RAILWAY AND URBAN RAIL TRANSIT, 2010, : 684 - 687
  • [24] Comparative analysis of geological prediction methods in karst aeras
    Luo, Li-Rui
    Liu, Zhi-Gang
    [J]. Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2011, 33 (SUPPL. 1): : 344 - 348
  • [25] Application of TSP tunnel geological prediction for case study
    Dai, Shulin
    Ma, Chaofang
    [J]. MECHATRONICS AND INTELLIGENT MATERIALS II, PTS 1-6, 2012, 490-495 : 1816 - 1820
  • [26] Advanced geological prediction technology of tunnel based on image recognition
    Chen, Huihong
    Liu, Shiming
    [J]. ARABIAN JOURNAL OF GEOSCIENCES, 2019, 12 (20)
  • [27] Advanced geological prediction technology of tunnel based on image recognition
    Huihong Chen
    Shiming Liu
    [J]. Arabian Journal of Geosciences, 2019, 12
  • [28] State of art and trends of advanced geological prediction in tunnel construction
    [J]. Li, S. (lishucai@sdu.edu.cn), 1600, Academia Sinica (33):
  • [29] Comprehensive geological prediction based on risk evaluation during tunneling in karst area
    Ge, Yan-Hui
    Li, Shu-Cai
    Zhang, Qing-Song
    Li, Li-Ping
    Liu, Bin
    [J]. Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2010, 32 (07): : 1124 - 1130
  • [30] Application of TSD tunnel seismic prediction system in karst area
    Lizhi DU1
    [J]. Global Geology, 2008, 11 (04) : 246 - 250