A Sequential Optimization Model of Cut-off Grade and Project/Location Selection in Open Pit Mining

被引:0
|
作者
Muttaqin, Benazir Imam Arif [1 ]
Rosyidi, Cucuk Nur [2 ]
Pujiyanto, Eko [2 ]
机构
[1] Inst Teknol Telkom Surabaya, Dept Ind Engn, Surabaya, Indonesia
[2] Univ Sebelas Maret, Fac Engn, Dept Ind Engn, Surakarta, Indonesia
来源
关键词
Cut-Off Grade Optimization; Mining Project Selection; Open Pit Mining; Analytical Approach; PROJECT PORTFOLIO SELECTION; DECISION; DEPOSITS;
D O I
10.7232/iems.2019.18.3.369
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
To maximize benefits and gain competitive advantages, open pit mining companies must make right decisions concerning the optimal cut-off grade and the selection of mining projects/locations. The maximum profit for each mining project/location can be achieved through the cut-off grade optimization The aim of this research is to develop a sequential optimization model to determine the optimal cut-off grade and mining project/location selection. The cut-off grade optimization model is developed using an analytical approach by considering several revenues and costs, including valuable waste materials revenue and reclamation cost. Two economic indicators, namely Net Present Value (NPV) and Return on Investment (ROI), and some constraints are used in the mining project/location selection model. A numerical example is given to illustrate the proposed model application. Through this research, it is expected that the proposed model can help mining companies to determine the optimal cut-off grade and which mining project/location should be selected.
引用
收藏
页码:369 / 382
页数:14
相关论文
共 50 条
  • [31] The effect of carbon pricing on cut-off grade and optimal pit limits in a high grade copper-cobalt deposit
    Rijsdijk, Timothy
    Nehring, Micah
    [J]. JOURNAL OF CLEANER PRODUCTION, 2022, 356
  • [32] MINING METHOD SELECTION AND OPTIMIZATION OF TRANSITION FROM OPEN PIT TO UNDERGROUND IN COMBINED MINING
    Bakhtavar, Ezzeddin
    Shahriar, Kourosh
    Oraee, Kazem
    [J]. ARCHIVES OF MINING SCIENCES, 2009, 54 (03) : 481 - 493
  • [33] A PSO-ANN integrated Model of Optimizing Cut-off grade and Grade of crude ore
    Xu, Sixin
    He, Yong
    Zhu, Kejun
    Liu, Ting
    Li, Yue
    [J]. ICNC 2008: FOURTH INTERNATIONAL CONFERENCE ON NATURAL COMPUTATION, VOL 7, PROCEEDINGS, 2008, : 275 - 279
  • [34] Problems of Assessing the Feasibility of Mining an Ore Deposit by Means of the ″Cut-Off Grade″ Concept.
    Wilke, F.Ludwig
    von der Linden, Eike
    [J]. Erzmetall: Journal for Exploration, Mining and Metallurgy, 1974, 27 (10): : 465 - 469
  • [35] A modified approach for cut-off grade and production rate optimization in block caving projects
    Shami-Qalandari, Mohammad
    Rahmanpour, Mehdi
    Amnieh, Hassan Bakhshandeh
    [J]. MINING TECHNOLOGY-TRANSACTIONS OF THE INSTITUTIONS OF MINING AND METALLURGY, 2024,
  • [36] Optimization of cut-off grades considering grade uncertainty in narrow, tabular gold deposits
    Birch, C.
    [J]. JOURNAL OF THE SOUTHERN AFRICAN INSTITUTE OF MINING AND METALLURGY, 2017, 117 (02) : 149 - 156
  • [37] An environmental oriented model for optimum cut off grades in open pit mining projects to minimize acid mine drainage
    Rashidinejad, F.
    Osanloo, M.
    Rezai, B.
    [J]. INTERNATIONAL JOURNAL OF ENVIRONMENTAL SCIENCE AND TECHNOLOGY, 2008, 5 (02) : 183 - 194
  • [38] The Selection of Open or Percutaneous Endoscopic Lumbar Discectomy According to an Age Cut-off Point
    Kim, Chi Heon
    Chung, Chun Kee
    Choi, Yunhee
    Shin, Sukyoun
    Kim, Myo Jeong
    Lee, Juhee
    Park, Byung Joo
    [J]. SPINE, 2015, 40 (19) : E1063 - E1070
  • [39] Cut-off grade determination for the maximum value of a small Wits-type gold mining operation
    Minnitt, RCA
    [J]. JOURNAL OF THE SOUTH AFRICAN INSTITUTE OF MINING AND METALLURGY, 2004, 104 (05): : 277 - 283
  • [40] The Influence of a Loose Layer Water Cut-off Curtain on the Slope Stability of Open-pit Coal Mines
    Wang, Hai
    [J]. MINE WATER AND THE ENVIRONMENT, 2024,