Research on Grading of Risk Factors in International EPC Projects from Contractors' Perspective

被引:0
|
作者
Li, Jiqin [1 ]
Yang, Yong [1 ]
Zheng, Yu [2 ]
Li, Xiaodong [2 ]
机构
[1] CSCEC Overseas Operat, 37 Maizidian St, Beijing 100026, Peoples R China
[2] Tsinghua Univ, Dept Construct Management, Beijing 100084, Peoples R China
关键词
International Projects; EPC; contractors; risk factors;
D O I
10.4028/www.scientific.net/AMM.438-439.1968
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
It has been common that more and more international projects are contracted using EPC mode, which brings higher requirements of risk management for Chinese engineering companies. Through literature research and expert interview, this paper systematically recognizes and classifies risk factors that may occurred in international EPC projects. Then, by applying AHP method, the weights of all risk factors are achieved. Furthermore, all risk factors are divided into three levels for the convenience of enterprise risk management. Hopefully, this research can be good reference as guidance for decision-making in the preliminary stage of international EPC projects.
引用
收藏
页码:1968 / +
页数:2
相关论文
共 50 条
  • [31] Exploring Critical Variables That Affect Political Risk Level in International Construction Projects: Case Study from Chinese Contractors
    Deng, Xiaopeng
    Low, Sui Pheng
    JOURNAL OF PROFESSIONAL ISSUES IN ENGINEERING EDUCATION AND PRACTICE, 2014, 140 (01)
  • [32] The Research of International EPC Project Risk Factors - A Case Study of Congo (Brazzaville), State Highway 1
    Xu, Wancai
    Wang, Zhouya
    Shen, Cheng
    Li, Xiaodong
    CIVIL ENGINEERING, ARCHITECTURE AND SUSTAINABLE INFRASTRUCTURE II, PTS 1 AND 2, 2013, 438-439 : 1958 - +
  • [33] Psychology teaching: the experience of international research and the perspective projects of collaboration
    Karandashev, VN
    PSIKHOLOGICHESKII ZHURNAL, 2001, 22 (02) : 86 - 89
  • [34] Risk factors in international rail-system projects
    Telmac, Ali
    Tantekin-Celik, Gozde
    ADVANCES IN CIVIL AND ARCHITECTURAL ENGINEERING, 2024, 15 (29): : 1 - 18
  • [35] Research on Risk Evaluation Method for International Engineering Projects
    HUANG Yi
    LI Sui-ke
    International Journal of Plant Engineering and Management, 2013, 18 (03) : 140 - 145
  • [36] Research on risk analysis and countermeasures in international construction projects
    Xu, CJ
    Zhang, H
    PROCEEDINGS OF THE 2004 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, 2004, : 215 - 217
  • [37] Contractors' Perspective on the Main Factors Influencing On-Site Labour Productivity: A Focus on Malaysian Infrastructure Projects
    Hanafi, Mohd Hanizun
    Zhen, Ong Ming
    Razak, Arman Abdul
    INTERNATIONAL JOURNAL OF SUSTAINABLE CONSTRUCTION ENGINEERING AND TECHNOLOGY, 2021, 12 (01): : 68 - 78
  • [38] Investigating critical risk factors of selecting joint venture contractors for infrastructure projects implementation in Vietnam
    Nguyen, Tiep
    Nguyen, Long Hoang
    Chileshe, Nicholas
    Hallo, Leonie
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2023, 23 (14) : 2438 - 2451
  • [39] Risk factors for otitis media: An international perspective
    Rovers, Maroeska M.
    de Kok, Inge M. C. M.
    Schilder, Anne G. M.
    INTERNATIONAL JOURNAL OF PEDIATRIC OTORHINOLARYNGOLOGY, 2006, 70 (07) : 1251 - 1256
  • [40] Improving risk assessment in financial feasibility of international engineering projects: A risk driver perspective
    Liu, Junying
    Jin, Feng
    Xie, Qunxia
    Skitmore, Martin
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2017, 35 (02) : 204 - 211