Retrofit of aerodynamic cable instability on a cable-stayed bridge - Case study

被引:2
|
作者
Telang, NM [1 ]
Minervino, CM [1 ]
Norton, PG [1 ]
机构
[1] Lichtenstein Consulting Engineers Inc, Natick, MA 01760 USA
关键词
D O I
10.3141/1740-08
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Elegantly poised over the Mobile River, the twin pylons and the semi-harped cable stays of the Cochrane Bridge subtly complement the vast and undulating landscape of the Mobile Bay as the bridge carries US Route 90 over the Mobile River in Alabama. In February 1998, light rain drizzled on the bridge, and a weather station nearby recorded wind speeds of about 48 km/h (30 mph). Under these seemingly mild weather conditions, the normally immobile cable stays started to vibrate, and within moments, these nascent vibrations reached amplitudes of more than 1.2 m (4 ft). Alarmed by this event, the Alabama Department of Transportation (ALDOT) took immediate action to ensure the continued safety and serviceability of the bridge. A team of consultants was selected by ALDOT to investigate mitigation measures for the large-amplitude cable-stay vibrations. The fast-tracked comprehensive program planned and implemented to inspect, test, document, and evaluate the effects of the large-amplitude vibrations and the recommendation of retrofit measures that would limit future occurrences of such cable-stay vibrations on the Cochrane Bridge are described in detail.
引用
收藏
页码:61 / 67
页数:7
相关论文
共 50 条
  • [41] JAPANESE CABLE-STAYED BRIDGE DESIGN
    BURDEN, AR
    [J]. PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS PART 1-DESIGN AND CONSTRUCTION, 1991, 90 : 1021 - 1051
  • [42] DYNAMIC BEHAVIOR OF A CABLE-STAYED BRIDGE
    FLEMING, JF
    EGESELI, EA
    [J]. EARTHQUAKE ENGINEERING & STRUCTURAL DYNAMICS, 1980, 8 (01): : 1 - 16
  • [43] Missouri Cable-Stayed Bridge Opens
    Goodwin, April
    [J]. Better Roads, 2004, 74 (02): : 94 - 97
  • [44] OPERATION AND MAINTENANCE OF CABLE-STAYED BRIDGE
    Tian Chunyan
    Yang Shengchao
    Zhang Na
    [J]. PROCEEDINGS OF THE 12TH INTERNATIONAL CONFERENCE ON INSPECTION APPRAISAL REPAIRS AND MAINTENANCE OF STRUCTURES, VOLS 1 AND 2, 2010, : 1059 - +
  • [45] Study on Aerodynamic Coefficient of Ultrahigh Multi-Limb Cable-Stayed Bridge Tower
    He X.
    Fang D.
    Wang H.
    Li H.
    [J]. Zhongguo Tiedao Kexue/China Railway Science, 2017, 38 (04): : 24 - 32
  • [46] WIND-TUNNEL STUDY OF AERODYNAMIC STABILITY AND RESPONSE OF A CABLE-STAYED BRIDGE DECK
    BIENKIEWICZ, B
    CERMAK, JE
    PETERKA, JA
    [J]. JOURNAL OF WIND ENGINEERING AND INDUSTRIAL AERODYNAMICS, 1987, 26 (03) : 341 - 352
  • [47] Basarab Cable-Stayed Bridge in Bucharest
    Manterola Armisen, Javier
    Martinez Cutillas, Antonio
    Fuente Garcia, Silvia
    [J]. STRUCTURAL ENGINEERING INTERNATIONAL, 2014, 24 (03) : 392 - 395
  • [48] Disproportionate collapse of a cable-stayed bridge
    Domaneschi, Marco
    Cimellaro, Gian Paolo
    Scutiero, Gianluca
    [J]. PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-BRIDGE ENGINEERING, 2019, 172 (01) : 13 - 26
  • [49] Modal Analysis of a Cable-stayed Bridge
    Wei, Liuchuang
    Cheng, Heming
    Li, Jianyun
    [J]. INTERNATIONAL CONFERENCE ON ADVANCES IN COMPUTATIONAL MODELING AND SIMULATION, 2012, 31 : 481 - 486
  • [50] A study on aerodynamic characteristics of edge-girder deck of composite cable-stayed bridge
    Katsuchi, Hiroshi
    Yamada, Hitoshi
    Ohashi, Harukazu
    [J]. Journal of Wind Engineering, 2009, 34 (04) : 103 - 110