A Regional Smart Power Grid Distribution Transformer Planning Method Considering Life Cycle Cost

被引:0
|
作者
Zhou, Bin [1 ]
Yan, Jing [2 ]
Yang, Dongjun [2 ]
Zheng, Xu [2 ]
Xiong, Zhi [2 ]
Zhang, Ji [3 ]
机构
[1] State Grid Hubei Elect Power Co Ltd, Wuhan, Peoples R China
[2] State Grid Hubei Elect Power Co Ltd, Econ & Technol Res Inst, Wuhan, Peoples R China
[3] State Grid Hubei Elect Power Co Ltd, Dept Econ & Technol Res Inst, Wuhan, Peoples R China
关键词
distribution transformer; life cycle cost; high energy consumption; transformation mode; replacement time;
D O I
10.1109/igbsg.2019.8886277
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
at present, in the research on transformation and adjustment of distribution transformers for regional smart power grid, most of them are around overhaul of high energy consumption or old transformers to prolong life. In the case of only one alternative distribution transformer, the original transformer is directly replaced by a lower power loss transformer to reduce cost. And through the comparison of these two aspects, the transformation plan can be determined. When there are a variety of alternative transformers, a replacement strategy of distribution transformers in regional smart power grid based on life cycle cost (LCC) is proposed in this paper. First, based on the life cycle cost of equipment level, the selection model of planning scheme is built. Then the replacement strategy is evaluated in order to clarify the most reasonable transformation mode and the best replaced time. Further, the feasibility and effectiveness of the strategy are verified by the relevant calculation examples. Finally, some measures to reduce LCC are put forward.
引用
收藏
页码:612 / 615
页数:4
相关论文
共 50 条
  • [31] Research on adaptive dispatching of smart grid considering the cost of renewable energy power generation
    Qin, Wenchao
    He, Jinding
    International Journal of Global Energy Issues, 2024, 46 (06) : 585 - 602
  • [32] Evaluation method of regional power grid planning based on the collaborative optimization efficiency of power grid project
    Liu Yingying
    Gao Yi
    Mao Hua
    Zhang Zhang
    Wu Xiao
    Yang Fan
    Duan Mengruo
    2018 CHINA INTERNATIONAL CONFERENCE ON ELECTRICITY DISTRIBUTION (CICED), 2018, : 2488 - 2491
  • [33] Optimum investment alternative for power transformer implementing probabilistic life cycle cost
    Bian, J.P.
    Sun, X.Y.
    Wang, M.M.
    Zheng, H.Q.
    Xing, H.
    Sun, X.Y., 1600, Sila Science, University Mah Mekan Sok, No 24, Trabzon, Turkey (32): : 7999 - 8006
  • [34] OPTIMAL MAINTENANCE STRATEGY FOR HOSPITAL POWER TRANSFORMER BASED ON LIFE CYCLE COST
    Bian, J. P.
    Sun, X. Y.
    Yang, S.
    Yang, J.
    BASIC & CLINICAL PHARMACOLOGY & TOXICOLOGY, 2015, 117 : 35 - 35
  • [35] SENSITIVITY AND UNCERTAINTY ANALYSIS ON VARIABLES OF LIFE CYCLE COST FOR HOSPITAL POWER TRANSFORMER
    Bian, J. P.
    Feng, Y. J.
    Sun, X. Y.
    Yang, S.
    BASIC & CLINICAL PHARMACOLOGY & TOXICOLOGY, 2016, 118 : 107 - 107
  • [36] A Planning Method of Substation Considering Main Transformer Adjustment Utilization and Safety Efficiency Cost
    Yang N.
    Liu Z.
    Yan J.
    Zheng X.
    Xin P.
    Liu S.
    Zhang L.
    Zhongguo Dianji Gongcheng Xuebao/Proceedings of the Chinese Society of Electrical Engineering, 2020, 40 (13): : 4187 - 4199
  • [37] Power Matching Method in Smart Grid Considering User Satisfaction by PIAX Platform
    Asami, Kosuke
    Yamashita, Akira
    Kutsuzawa, Ryo
    Takemura, Naoya
    Matsumoto, Jun
    Takeshita, Hidetoshi
    Yamanaka, Naoaki
    2016 IEEE 17TH INTERNATIONAL CONFERENCE ON HIGH PERFORMANCE SWITCHING AND ROUTING (HPSR), 2016, : 128 - 133
  • [38] Multi-stage power source and grid coordination planning method considering grid uniformity
    Li Z.
    Han X.
    Yang M.
    Ma Y.
    Global Energy Interconnection, 2020, 3 (04) : 303 - 312
  • [39] Multi-stage power source and grid coordination planning method considering grid uniformity
    Zhiqi Li
    Xueshan Han
    Ming Yang
    Yiran Ma
    Global Energy Interconnection, 2020, 3 (04) : 303 - 312
  • [40] The Impact of the New Round of Transmission and Distribution Price Verification on the Life-cycle Cost of Power Grid Projects
    Li, Tong
    Zhang, Heng
    Wang, Xiaohui
    Liu, Yaqiong
    Wang, Meibao
    2021 8TH INTERNATIONAL FORUM ON ELECTRICAL ENGINEERING AND AUTOMATION, IFEEA, 2021, : 349 - 352