Effect of Faults on Electrical Equipment in Power Substation: A Case Study of Metropolitan Electricity Authority's Power System

被引:0
|
作者
Siriwithtayathanakun, P. [1 ]
Sriyanyong, P. [1 ]
机构
[1] King Mongkuts Univ Technol North Bangkok, Dept Teacher Training Elect Engn, Bangkok, Thailand
关键词
ATP-EMTP; Load Shedding;
D O I
暂无
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
This paper studies the influence on electrical equipment and the frequency disturbance caused by the Line to Line Fault in the power system. This study takes the actual situation at Metropolitan Electricity Authority (MEA)' s substation which is 115 V power transmission line. The study examines the voltage and the frequency changes occurring in the power system by using MEA's power system simulation with Transient Program (ATP-EMTP) used in the 115 V power transmission line, Line to Line Fault, at 10 km approximately occurs at Y-B phase. As a result of the power system simulation, the Voltage Waveform is changed and shifted. It resulted in the frequency decreases. The lowest frequency of B phase is about 41.578 Hz ort 16.844% when compared to the power system frequency at 50 Hz and resulted in a maximum voltage phase R is 25.9 kV or increase 87.5%.
引用
收藏
页码:180 / 183
页数:4
相关论文
共 50 条
  • [31] Research on Big Data Query Optimization Method of Power System Substation Equipment Condition Monitoring
    Wang, Lixia
    Wang, Dawei
    Li, Wei
    2021 IEEE IAS INDUSTRIAL AND COMMERCIAL POWER SYSTEM ASIA (IEEE I&CPS ASIA 2021), 2021, : 1479 - 1483
  • [32] Unified Identification of Power and Gas Faults for Integrated Electricity and Natural Gas Energy System
    Zhong, Junjie
    Li, Yong
    Cao, Yijia
    Zeng, Zilong
    Hu, Bo
    PROCEEDINGS OF 2017 CHINA INTERNATIONAL ELECTRICAL AND ENERGY CONFERENCE (CIEEC 2017), 2017, : 867 - 872
  • [33] Will Updated Electricity Infrastructure Security Protect the Grid? A Case Study Modeling Electrical Substation Attacks
    McGrath, Jenna K.
    INFRASTRUCTURES, 2018, 3 (04)
  • [34] EFFECT OF NODAL ELEVATION REVISION IN WATER DISTRIBUTION SYSTEM: A CASE STUDY OF METROPOLITAN WATERWORKS AUTHORITY, THAILAND
    Wannapop, Rangsan
    Jearsiripongkul, Thira
    Jiamjiroch, Krit
    INTERNATIONAL JOURNAL OF GEOMATE, 2019, 16 (53): : 184 - 189
  • [35] GIS Application to Distribution Substation Planning in MEA's Power System
    Phayomhom, A.
    Rugthaicharoencheep, N.
    Chaitusaney, S.
    2015 12TH INTERNATIONAL CONFERENCE ON ELECTRICAL ENGINEERING/ELECTRONICS, COMPUTER, TELECOMMUNICATIONS AND INFORMATION TECHNOLOGY (ECTI-CON), 2015,
  • [36] SYSTEM FOR MONITORING AND EVALUATING RESIDUAL OPERATION TIME OF POWER ELECTRICAL EQUIPMENT
    Zhukovskiy, Yu. L.
    Kozyaruk, A. E.
    Korzhev, A. A.
    Krivenko, A. V.
    JOURNAL OF MINING INSTITUTE, 2008, 178 : 17 - 21
  • [37] NETA MAINTENANCE TESTING RESEARCH ON ELECTRICAL POWER SYSTEM EQUIPMENT PERFORMANCE
    Heid, Kerry
    Widup, Ron
    2011 RECORD OF CONFERENCE PAPERS INDUSTRY APPLICATIONS SOCIETY 58TH ANNUAL IEEE PETROLEUM AND CHEMICAL INDUSTRY CONFERENCE (PCIC), 2011,
  • [38] Case Study: Amesbury #5 Substation Power Transformer Emergency Relocation
    Gavin, Carli
    IEEE Power and Energy Society General Meeting, 2023, 2023-July
  • [39] Strategies to prevent faults of voltage and reactive power control equipment for 10 kV system
    Shandong Electric Power Research Institute, Ji'nan 250002, China
    不详
    不详
    不详
    Dianli Zidonghua Shebei Electr. Power Autom. Equip., 2007, 4 (35-38):
  • [40] Case Study: Amesbury #5 Substation Power Transformer Fmergency Relocation
    Gavin, Carli
    2023 IEEE POWER & ENERGY SOCIETY GENERAL MEETING, PESGM, 2023,