PROJECT RISK RANKING IN LARGE-SCALE PROGRAMS: A FUZZY SET BASED APPROACH

被引:1
|
作者
Zacharias, Othonas [1 ]
Panou, Eleni [1 ]
Askounis, D. Th. [1 ]
Vassilikopoulou, Aikaterini [2 ]
机构
[1] Natl Tech Univ Athens, Sch Elect & Comp Engn, GR-15773 Zografos, Greece
[2] Technol Educ Inst Athens, GR-12210 Aigaleo, Greece
关键词
Fuzzy sets; large-scale programs; project risk ranking; projects auditing; program risk management; DECISION-MAKING;
D O I
10.1142/S0217595914500201
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
As most of the global economic activity takes place in the form of projects/programs, their effective management and governance is becoming more and more critical to the competitive position of organizations and societies. Project auditing and risk management, elaborate on methodologies that could be used for analyzing project progress, by identifying potential risks and liabilities, and finally recommending corrective and preventive actions. In relation to these fields, this paper proposes a fuzzy set based approach for project risk ranking in large-scale programs. The proposed approach defines a generic list of risk factors which is used for the ranking and risk assessment of all projects of a program. Data describing projects' progress as well as expert's evaluation of risk factors and project's risk exposure are being used as input parameters to the fuzzy set system. The relative probability of risk appearance due to risk factors for each of the projects is being calculated by providing valuable means for efficient decision-making and success of the program. Finally, this paper describes a case study called Operational Program "Road Axes, Ports, Urban Development" of Community Support Framework III in Greece, where the proposed approach was successfully applied.
引用
收藏
页数:22
相关论文
共 50 条
  • [41] New approach presented in Norway for large-scale cancer screening programs
    Lake, Francesca
    [J]. JOURNAL OF COMPARATIVE EFFECTIVENESS RESEARCH, 2012, 1 (04) : 303 - 304
  • [42] FEASIBLE DIRECTION METHOD FOR LARGE-SCALE NONCONVEX PROGRAMS - DECOMPOSITION APPROACH
    GEROMEL, JC
    BAPTISTELLA, LFB
    [J]. JOURNAL OF OPTIMIZATION THEORY AND APPLICATIONS, 1981, 35 (02) : 231 - 249
  • [43] RESEARCH IN LARGE-SCALE INTERVENTION PROGRAMS
    FREEMAN, HE
    SHERWOOD, CC
    [J]. JOURNAL OF SOCIAL ISSUES, 1965, 21 (01) : 11 - 28
  • [44] PLANNING FOR LARGE-SCALE OBSERVATIONAL PROGRAMS
    HOLLAND, JZ
    WILLIAMS, SL
    [J]. BULLETIN OF THE AMERICAN METEOROLOGICAL SOCIETY, 1971, 52 (09) : 850 - &
  • [45] Implementing Fuzzy TOPSIS on Project Risk Variable Ranking
    Husin, Saiful
    Fachrurrazi, Fachrurrazi
    Rizalihadi, Maimun
    Mubarak, Mubarak
    [J]. ADVANCES IN CIVIL ENGINEERING, 2019, 2019
  • [46] Large-scale audits set to spread
    不详
    [J]. PROCESS ENGINEERING, 1996, 77 (02) : 9 - 9
  • [47] LMI-based approach for stability analysis of fuzzy large-scale system with time delays
    Zhang, HB
    Liao, XF
    Li, XD
    Yu, JB
    [J]. 2004 INTERNATIONAL CONFERENCE ON COMMUNICATION, CIRCUITS, AND SYSTEMS, VOLS 1 AND 2: VOL 1: COMMUNICATION THEORY AND SYSTEMS, 2004, : 1401 - 1405
  • [48] A Novel Picture Fuzzy Set-Based Decision Approach for Consumer Trust Project Risk Assessment
    Yu, Liying
    Fang, Haijie
    Rong, Yuan
    Min, Jingye
    Xing, Yuanzhi
    [J]. SYSTEMS, 2023, 11 (03):
  • [49] A study of large-scale data clustering based on fuzzy clustering
    Li, Yangyang
    Yang, Guoli
    He, Haiyang
    Jiao, Licheng
    Shang, Ronghua
    [J]. SOFT COMPUTING, 2016, 20 (08) : 3231 - 3242
  • [50] LARGE-SCALE PROJECT - ALGIERS CONFERENCE
    MILI, M
    [J]. TELECOMMUNICATION JOURNAL, 1975, 42 (08): : 444 - 447