Adaptability of the Cutter-Head of the Earth Pressure Balance (EPB) Shield Machine in Water-Rich Sandy and Cobble Strata: A Case Study

被引:8
|
作者
Wan, Chaodong [1 ,2 ,3 ]
Jin, Zhiyi [1 ,4 ]
机构
[1] Southwest Jiaotong Univ, Minist Educ, Key Lab Transportat Tunnel Engn, Chengdu 610031, Peoples R China
[2] China Railway 18th Bur Grp, Engn Co Ltd 4, Tianjin 300451, Peoples R China
[3] China Railway 18 Bur Grp Co Ltd, Tianjin 300451, Peoples R China
[4] Southwest Jiaotong Univ, Sch Civil Engn, Chengdu 610031, Peoples R China
基金
中国国家自然科学基金;
关键词
PERFORMANCE; TUNNEL; MODEL;
D O I
10.1155/2020/8847982
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Earth Pressure Balance (EPB) shield machines are considered to be the most efficient tunneling method for Metro tunnels due to their adaptability to a great variety of ground conditions, higher construction efficiency, and providing a safer working environment. There are many guidelines available for EPB shield machine selection. However, these guidelines are very general and cannot be used directly for an upcoming project. This paper takes Chengdu Metro Line 6 in China as the engineering background; the studied area is typical of a water-rich sandy and cobble stratum with high content of cobble. Three types of EPBs in the two continuous intervals exhibit significant differences in performance and encounter many difficulties such as wear of the cutter disc and tools, clogging, and severe surface settlement during the operation. These difficulties prevent the construction efficiency, increase the cost of the project, and cause delays in construction period. The causes of these difficulties are summarized by recording and comparing the operational parameters of the three types of EPBs. These parameters that are summarized include the advance rate, total thrust, torque, and the rate of rotation of the cutter-head. In addition, the surface settlements are also compared. The results indicate that the opening rate, maximum opening size, and the opening position of the cutter-head are key factors that affected the geological adaptability of the shield machine in water-rich sandy and cobble strata. Among the three factors, the maximum opening size and opening position are the most important factors influencing the strata adaptability of the cutter-head. To avoid frequent jams of the cutter-head, the maximum torque should be not less than 6,500 kNm. The maximum opening size should not be less than 420 mm x 420 mm. The effect of increasing the central opening of the cutter-head is that large cobbles and boulders can be discharged through the central opening when they cannot be discharged through the opening near the original position of the cobbles and boulders. This paper provides specific guidance on the selection of cutter-head for shield machines in water-rich sandy and cobble strata.
引用
收藏
页数:12
相关论文
共 20 条
  • [11] Numerical investigation on the spewing mechanism of earth pressure balance shield in a high-pressure water-rich sand stratum
    Zhiyong Yang
    Weiqiang Qi
    Yanjie Ding
    Yusheng Jiang
    Xinkang Yang
    Xing Yang
    Xiaokang Shao
    Deep Underground Science and Engineering, 2023, 2 (01) : 74 - 87
  • [12] Failure mechanisms of ground collapse caused by shield tunnelling in water-rich composite sandy stratum: A case study
    Peng, Sige
    Huang, Weiran
    Luo, Guanyong
    Cao, Hong
    Pan, Hong
    Mo, Nuanjiao
    ENGINEERING FAILURE ANALYSIS, 2023, 146
  • [13] Study on Micro Disturbance Deformation Analysis and Control of Earth Pressure Balance Shield Sidearm Crossing Buildings in Water-rich Soft Soil Stratum
    Chang, Hongtao
    Zhen, Cheng
    Wang, Xiaorui
    2022 8TH INTERNATIONAL CONFERENCE ON HYDRAULIC AND CIVIL ENGINEERING: DEEP SPACE INTELLIGENT DEVELOPMENT AND UTILIZATION FORUM, ICHCE, 2022, : 1114 - 1119
  • [14] Earth pressure balance shield tunneling in sandy gravel deposits: a case study of application of soil conditioning
    Yingjie Wei
    Yuyou Yang
    Mingjiang Tao
    Duli Wang
    Yuxin Jie
    Bulletin of Engineering Geology and the Environment, 2020, 79 : 5013 - 5030
  • [15] Earth pressure balance shield tunneling in sandy gravel deposits: a case study of application of soil conditioning
    Wei, Yingjie
    Yang, Yuyou
    Tao, Mingjiang
    Wang, Duli
    Jie, Yuxin
    BULLETIN OF ENGINEERING GEOLOGY AND THE ENVIRONMENT, 2020, 79 (09) : 5013 - 5030
  • [16] Evaluation and prediction of earth pressure balance shield performance in complex rock strata: A case study in Dalian, China
    Shen, Xiang
    Yuan, Dajun
    Lin, Xing-Tao
    Chen, Xiangsheng
    Peng, Yuansheng
    JOURNAL OF ROCK MECHANICS AND GEOTECHNICAL ENGINEERING, 2023, 15 (06) : 1491 - 1505
  • [17] Disaster mechanism analysis for segments floating of large-diameter shield tunnel construction in the water-rich strata: A case study
    Shi, Zhou
    Xu, Jinfeng
    Xie, Xiongyao
    Zeng, Hongbo
    Xu, Weijiang
    Niu, Gang
    Xiao, Zhonglin
    ENGINEERING FAILURE ANALYSIS, 2024, 157
  • [18] Phenomenon and Critical Conditions of Chamber Soil Sliming during EPB Shield Tunneling in Water-Rich Weathered Diorite: Case Study of Jinan Metro, China
    Wang, Lu
    Zhu, Wei
    Qian, Yongjin
    Xu, Chao
    Hu, Jiannan
    Xing, Huitang
    ADVANCES IN CIVIL ENGINEERING, 2020, 2020
  • [19] Factorial Experiments of Soil Conditioning for Earth Pressure Balance Shield Tunnelling in Water-Rich Gravel Sand and Conditioning Effects’ Prediction Based on Particle Swarm Optimization–Relevance Vector Machine Algorithm
    Nong, Xingzhong
    Bai, Wenfeng
    Chen, Jiandang
    Zhang, Lihui
    Buildings, 2024, 14 (09)
  • [20] Function mechanism and analytical method of a double layer pre-support system for tunnel underneath passing a large-scale underground pipe gallery in water-rich sandy strata: A case study
    Zhao, Chenyang
    Lei, Mingfeng
    Shi, Chenghua
    Cao, Haorong
    Yang, Weichao
    Deng, E.
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2021, 115