The urban transport planning with uncertainty in demand and travel time: a comparison of two defuzzification methods

被引:24
|
作者
Avila-Torres, Paulina [1 ]
Caballero, Rafael [2 ]
Litvinchev, Igor [3 ]
Lopez-Irarragorri, Fernando [3 ]
Vasant, Pandian [4 ]
机构
[1] Univ Autonoma Nuevo Leon, Univ Malaga, Av Pedro de Alba S-N, San Nicolas De Los Garza 66450, NL, Mexico
[2] Univ Malaga, Campus El Ejido S-N, E-29071 Malaga, Spain
[3] Univ Autonoma Nuevo Leon, Av Pedro de Alba S-N, San Nicolas De Los Garza 66450, NL, Mexico
[4] Univ Teknol PETRONAS, Teronoh 32610, Perak, Malaysia
关键词
Frequency; Timetable; Urban transport; Fuzzy; EPSILON-CONSTRAINT METHOD; PROGRAMMING-PROBLEMS; TRANSIT NETWORK; STOCHASTIC OPTIMIZATION; DESIGN; SYNCHRONIZATION; ALGORITHMS;
D O I
10.1007/s12652-017-0545-x
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Nowadays the traffic congestion is being a common problem in major cities, every time the travel time is increasing and also the number of private cars. It is urgent to take actions to solve this problem. The urban transport is becoming into the best way to fight against congestion; but to make it more attractive to users it has to be more efficient (less travel time, less waiting time, low fare). The urban transport process has four main activities: Network design, Timetabling, Vehicle scheduling and Crew scheduling. The problem presented here is about the integration of the frequency and departure time scheduled both are subactivities of the timetable construction, besides it includes multiple periods planning and multiperiod synchronization, also the authors consider uncertainty in demand and travel time using fuzzy numbers. The planners faced this problem everyday. The authors created a mathematical model including the characteristics previously mentioned, the objectives of this model are to minimize the total operation cost, to maximize the number of multiperiod synchronization between routes, and to minimize the total waiting time for passengers. The SAugmecon method is used to solve the problem, 32 instances were randomly generated based on real data, and the comparison of two defuzzification methods (k-preference and second index of Yager) is presented. Also, the comparison of the problem with uncertainty on demand and uncertainty on demand and travel time is presented.
引用
收藏
页码:843 / 856
页数:14
相关论文
共 50 条
  • [21] Robust vehicle routing problem with hard time windows under demand and travel time uncertainty
    Hu, C.
    Lu, J.
    Liu, X.
    Zhang, G.
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2018, 94 : 139 - 153
  • [22] Forecasting travel demand: a comparison of logit and artificial neural network methods
    de Carvalho, MCM
    Dougherty, MS
    Fowkes, AS
    Wardman, MR
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1998, 49 (07) : 717 - 722
  • [23] Comparison of prediction methods for urban network link travel times
    Hartley, JK
    [J]. SIMULATION IN INDUSTRY, 2003, : 569 - 576
  • [24] Urban Micro-circulation Bus Planning Based on Temporal and Spatial Travel Demand
    Du, Bowen
    Qiao, Yanan
    Zhao, Jiejie
    Sun, Leilei
    Lv, Weifeng
    Huang, Runhe
    [J]. 2019 IEEE SMARTWORLD, UBIQUITOUS INTELLIGENCE & COMPUTING, ADVANCED & TRUSTED COMPUTING, SCALABLE COMPUTING & COMMUNICATIONS, CLOUD & BIG DATA COMPUTING, INTERNET OF PEOPLE AND SMART CITY INNOVATION (SMARTWORLD/SCALCOM/UIC/ATC/CBDCOM/IOP/SCI 2019), 2019, : 981 - 988
  • [25] Two-stage workforce planning under demand fluctuations and uncertainty
    Zhu, X.
    Sherali, H. D.
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2009, 60 (01) : 94 - 103
  • [26] A two-stage skilled manpower planning model with demand uncertainty
    Sadeghi-Dastaki, Mohsen
    Afrazeh, Abbas
    [J]. INTERNATIONAL JOURNAL OF INTELLIGENT COMPUTING AND CYBERNETICS, 2018, 11 (04) : 526 - 551
  • [27] Freight transport platoon coordination and departure time scheduling under travel time uncertainty
    Zhang, Wei
    Jenelius, Erik
    Ma, Xiaoliang
    [J]. TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2017, 98 : 1 - 23
  • [28] A tool planning approach considering cycle time constraints and demand uncertainty
    Muh-Cherng Wu
    Yai Hsiung
    Hsi-Mei Hsu
    [J]. The International Journal of Advanced Manufacturing Technology, 2005, 26 : 565 - 571
  • [29] A tool planning approach considering cycle time constraints and demand uncertainty
    Wu, MC
    Hsiung, Y
    Hsu, HM
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2005, 26 (5-6): : 565 - 571
  • [30] Resampling Methods for Estimating Travel Time Uncertainty: Application of the Gap Bootstrap
    Naik, Bhaven
    Rilett, Laurence R.
    Appiah, Justice
    Walubita, Lubinda F.
    [J]. TRANSPORTATION RESEARCH RECORD, 2018, 2672 (42) : 137 - 147