Improving the Accuracy of Project Schedules

被引:5
|
作者
Lorko, Matej [1 ,2 ]
Servatka, Maros [1 ,2 ]
Zhang, Le [1 ]
机构
[1] Macquarie Business Sch, MGSM Expt Econ Lab, Sydney, NSW, Australia
[2] Univ Econ Bratislava, Fac Natl Econ, Bratislava, Slovakia
关键词
project management; project planning; duration estimation; historical information; project specification; PUBLIC-WORKS PROJECTS; SOFTWARE-DEVELOPMENT; FORECASTS; JUDGMENT; PEOPLE; TIME; BIAS;
D O I
10.1111/poms.13299
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
How to avoid project failures driven by overoptimistic schedules? Managers often attempt to mitigate the duration underestimation and improve the accuracy of project schedules by providing their planners with excessively detailed project specifications. While this traditional approach may be intuitive, solely providing more detailed information has proven to have a limited effect on eliminating behavioral biases. We experimentally test the effectiveness of providing detailed specification and compare it to an alternative intervention of providing historical information about the average duration of similar projects in the past. We find that both interventions mitigate the underestimation bias. However, since providing detailed project specification results in high variance of estimation errors due to sizable over- and underestimates, only the provision of historical information leads to more accurate project duration estimates. We also test whether it is more effective to anchor planners by providing historical information simultaneously with the project specification or to provide the historical information only after beliefs regarding the project duration are formed, in which case planners can regress their initial estimates toward the historical average. We find that the timing of disclosing information does not play a role as the estimation bias is mitigated and the accuracy is improved in both conditions. Finally, we observe that the subjective confidence in the accuracy of duration estimates does not vary across the interventions, suggesting that the confidence is neither a function of the amount nor the detail of available information.
引用
收藏
页码:1633 / 1646
页数:14
相关论文
共 50 条
  • [21] Improving the accuracy and operational predictability of project cost forecasts: an adaptive combination approach
    Kim, Byung-Cheol
    Kwak, Young Hoon
    PRODUCTION PLANNING & CONTROL, 2018, 29 (09) : 743 - 760
  • [22] Improving the Diagnostic Accuracy in Axial Spondyloarthritis: Interim Results of a Nationwide Telemedicine Project
    Poddubnyy, Denis
    Kaemmerer, Marc
    Kremers, Marcus
    Schoppen, Berit
    Arens, Charlotte
    Wiedon, Annette
    Redeker, Imke
    Baraliakos, Xenofon
    ARTHRITIS & RHEUMATOLOGY, 2023, 75 : 2730 - 2732
  • [23] Application of telematics for improving multiple schedules
    Oldenkamp, JH
    Heesen, C
    Simons, JL
    MEDICAL INFORMATICS EUROPE '97: PARTS A & B, 1997, 43 : 64 - 68
  • [24] IMPROVING MEDIA SCHEDULES VIA COMPUTER
    LANDIS, JB
    COMPUTER OPERATIONS, 1968, 2 (01): : 22 - &
  • [25] Improving robustness of spacecraft downlink schedules
    Oddi, Angelo
    Policella, Nicola
    IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS PART C-APPLICATIONS AND REVIEWS, 2007, 37 (05): : 887 - 896
  • [26] IMPROVING THROUGH-FLIGHT SCHEDULES
    BARD, JF
    CUNNINGHAM, IG
    IIE TRANSACTIONS, 1987, 19 (03) : 242 - 251
  • [27] IMPROVING ACCURACY
    Hogue, Cheryl
    CHEMICAL & ENGINEERING NEWS, 2012, 90 (19) : 26 - 27
  • [28] IMPROVING ACCURACY
    MORIZIO, T
    FORTUNE, 1992, 126 (14) : 97 - 97
  • [29] Model for improving the accuracy of relevant project selection in analogy using differential evolution algorithm
    Thamarai, I.
    Murugavalli, S.
    SADHANA-ACADEMY PROCEEDINGS IN ENGINEERING SCIENCES, 2017, 42 (01): : 23 - 31