Design and construction of the new railway bridge over the Neckar river - challenges of the foundations

被引:1
|
作者
Lienhart, Christoph [1 ]
Heer, Sebastian [1 ]
Wenger, Philipp [2 ]
Zimmerer, Martin [3 ]
机构
[1] DB Projekt Stuttgart Ulm GmbH, Rapplenstr 19, D-70191 Stuttgart, Germany
[2] Schlaich Bergermann Partner Sbp Gmbh, Schwabstr 43, D-70197 Stuttgart, Germany
[3] CDM Smith Consult GmbH, Ingersheimer Str 10, D-70499 Stuttgart, Germany
关键词
railway bridge; pile foundation; multiple fixed bearings; artesian groundwater; Stuttgart; 21;
D O I
10.1002/bate.201600092
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
As of the beginning of 2016, as part of the Stuttgart 21 infrastructure project, the Deutsche Bahn is building a four-line railway bridge across the Neckar River in Stuttgart. The Neckar railway bridge has an overall length of 345 m and comprises of two abutments and six support axes. The structure crosses rail lines from the city rail network (Stadtbahn), the main trunk-road, the B 10, inner city roads, the Neckar River, pedestrian and cycle ways as well as diverse public and private utilities. The bridge structure is located within the core mineral water protection zone, with its strict restrictions regarding permissible depth of penetration into the subsoil and groundwater reservoirs. The mineral water springs lie within the construction site 26 m below the surface as artesian aquafers with an artesian pressure of circa 10 m above ground level. From a groundwater management perspective, and following a program of five ground investigations and their evaluation, a raft foundation at the mid-level of the "Unterkeuper", built using cut-andcover technique with a pneumatic caisson was chosen as the most economical foundation type for the three primary supports. A program of further hydrochemical and geomechanical ground investigations were undertaken during the detailed design phases. Following an evaluation of these additional ground parameters it was possible to substitute the pneumatic caisson for a more economical deep foundation type using large diameter piles. A management concept for possible scenarios was needed for the large diameter pile construction to achieve the required consent for derogations from the banned ground penetration in the area of the mineral springs.
引用
收藏
页码:104 / 114
页数:11
相关论文
共 50 条
  • [21] The design and construction of cable-stayed bridge over Bouregreg River, Morocco
    Wang, Yingliang
    Gao, Zongyu
    Chen, Zonghui
    Zhao, Wenyi
    Shi, Jianhua
    Liao, Mujie
    BAUTECHNIK, 2019, 96 (02) : 150 - 159
  • [22] Design of drilled shaft foundations for the Cooper River Bridge
    Castelli, RJ
    GEOTECHNICAL ENGINEERING FOR TRANSPORTATION PROJECTS, VOL 1, 2004, (126): : 334 - 346
  • [23] Design and construction of the new bridge across the river Elbe near Pirna
    Eilzer, Wolfgang
    Kobsch, Siegfried
    Arloth, Rainer
    Jung, Rolf
    Stahlbau, 1997, 66 (07): : 396 - 411
  • [24] Design of bridge over Cuiaba river
    Fernanda Quintana, Ma.
    Gratao, Franklin
    Moura, Raquel
    MEMORIA INVESTIGACIONES EN INGENIERIA, 2011, (09): : 79 - 90
  • [25] Rose Fitzgerald Kennedy Bridge Over the River Barrow: Design and Construction of a Multispan Extrados Concrete Bridge
    Suarez, Miguel Angel Astiz
    Sanchez, Marcos
    Martin, Lucia Blanco
    Calle, Guillermo Ayuso
    Long, Cian
    TRANSPORTATION RESEARCH RECORD, 2022,
  • [26] New Champlain Bridge Over the Saint Lawrence River in Montreal. Design of the Temporary Works for the Construction of the Cable-Stayed Bridge
    Peiretti, Hugo Corres
    Caldentey, Alejandro Perez
    Mateos, Javier Milian
    Nunez, Alejandro Abel
    Ballesteros, Antonio Romero
    Serrano, Conchita Lucas
    HORMIGON Y ACERO, 2022, 73 (297): : 31 - 39
  • [27] The new bridge over the Po river for the new railway line high capacity Bologna-Milan
    Il nuovo ponte ferroviario sul Po per la linea AV Bologna-Milano
    2001, Collegio Ingegneria Ferroviaria Italiani (56):
  • [28] Elimination of modal collision: railway bridge over the Regalica River
    Bernacki, Dariusz
    Lis, Christian
    SCIENTIFIC JOURNALS OF THE MARITIME UNIVERSITY OF SZCZECIN-ZESZYTY NAUKOWE AKADEMII MORSKIEJ W SZCZECINIE, 2019, 59 (131): : 43 - 52
  • [29] Hydraulic checks in railway crossings: The bridge over the esino river
    Monni, Stefano
    Zammuto, Alessandra
    Astolfi, Enrico
    Ingegneria Ferroviaria, 2021, 76 (05): : 369 - 387
  • [30] The new railway bridge over the Rhein in Wesel
    Ehrenberg, R
    ZEITSCHRIFT DES VEREINES DEUTSCHER INGENIEURE, 1928, 72 : 485 - 490