NSGA-III for solving dynamic flexible job shop scheduling problem considering deterioration effect

被引:16
|
作者
Wu, Xiuli [1 ]
Li, Jing [1 ]
Shen, Xianli [1 ]
Zhao, Ning [1 ]
机构
[1] Univ Sci & Technol Beijing, Sch Mech Engn, Dept Logist Engn, Beijing, Peoples R China
基金
中国国家自然科学基金;
关键词
genetic algorithms; Pareto optimisation; computational complexity; manufacturing systems; job shop scheduling; optimisation; scheduling; sorting; energy consumption; stability criteria; Pareto solution; nondominated sorting genetic algorithm III; NP-hard problem; stability; makespan; multiobjective optimisation; processing time prediction; unqualified jobs reprocessing; explicit disturbance; implicit disturbance; DF[!text type='JS']JS[!/text]P-DE; stochastic events; NSGA-III; dynamic job shop scheduling; step-deterioration effect model; ALGORITHM; MAINTENANCE; MAKESPAN;
D O I
10.1049/iet-cim.2019.0056
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The production process of manufacturing systems is usually not static and always interrupted by stochastic events, such as the deterioration effect of cutting tools. This study focuses on the dynamic flexible job shop-scheduling problem considering the deterioration effect (DFJSP-DE). Two types of disturbances are considered, i.e. the implicit disturbance caused by the deterioration effect and the explicit disturbance caused by the reprocessing of unqualified jobs. Firstly, a step-deterioration effect model is proposed, with which the actual processing time of each operation can be predicted more accurately. A multi-objective optimisation model is formulated for the DFJSP-DE. The makespan, energy consumption, and stability of rescheduling solutions are three objectives to be optimised simultaneously. For this non-deterministic polynominal (NP)-hard problem, the non-dominated sorting genetic algorithm III is employed to search the Pareto solutions for the DFJSP-DE. Finally, the results of three numerical experiments show that the proposed approach can solve DFJSP-DE effectively and efficiently.
引用
收藏
页码:22 / 33
页数:12
相关论文
共 50 条
  • [41] Solving the flexible job shop scheduling problem using an improved Jaya algorithm
    Caldeira, Rylan H.
    Gnanavelbabu, A.
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2019, 137
  • [42] Development of Both the AIS and PSO for Solving the Flexible Job Shop Scheduling Problem
    Sadrzadeh, Amir
    [J]. ARABIAN JOURNAL FOR SCIENCE AND ENGINEERING, 2013, 38 (12) : 3593 - 3604
  • [43] Differential evolution algorithm for solving distributed flexible job shop scheduling problem
    Wu, Xiuli
    Liu, Xiajing
    [J]. Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2019, 25 (10): : 2539 - 2558
  • [44] A tabu search algorithm for solving a multicriteria flexible job shop scheduling problem
    Vilcot, Geoffrey
    Billaut, Jean-Charles
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2011, 49 (23) : 6963 - 6980
  • [45] A novel initialization method for solving flexible job-shop scheduling problem
    Shi Yang
    Zhang Guohui
    Gao Liang
    Yuan Kun
    [J]. CIE: 2009 INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2009, : 68 - +
  • [46] An improved SFLA for flexible job shop scheduling problem considering energy consumption
    Zhang, Xiaoxing
    Ji, Zhicheng
    Wang, Yan
    [J]. MODERN PHYSICS LETTERS B, 2018, 32 (34-36):
  • [47] Flexible job shop dual resource scheduling problem considering loading and unloading
    Wu, Xiu-Li
    Xiao, Xiao
    Zhao, Ning
    [J]. Kongzhi yu Juece/Control and Decision, 2020, 35 (10): : 2475 - 2485
  • [48] A novel dynamic scheduling strategy for solving flexible job-shop problems
    Tao Ning
    Ming Huang
    Xu Liang
    Hua Jin
    [J]. Journal of Ambient Intelligence and Humanized Computing, 2016, 7 : 721 - 729
  • [49] A novel dynamic scheduling strategy for solving flexible job-shop problems
    Ning, Tao
    Huang, Ming
    Liang, Xu
    Jin, Hua
    [J]. JOURNAL OF AMBIENT INTELLIGENCE AND HUMANIZED COMPUTING, 2016, 7 (05) : 721 - 729
  • [50] Solving the Flexible Job Shop Problem on GPU
    Bozejko, Wojciech
    Uchronski, Mariusz
    Wodecki, Mieczyslaw
    [J]. ARTIFICIAL INTELLIGENCE AND SOFT COMPUTING, PT II, 2012, 7268 : 387 - 394