A Lagrangean heuristic algorithm for disassembly scheduling with capacity constraints

被引:26
|
作者
Kim, H. -J. [1 ]
Lee, D. -H.
Xirouchakis, P.
机构
[1] Swiss Fed Inst Technol, EPFL, STI,IPR,LIPCP, CH-1015 Lausanne, Switzerland
[2] Hanyang Univ, Seoul 133791, South Korea
关键词
environmental studies; production and scheduling; heuristics;
D O I
10.1057/palgrave.jors.2602094
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper considers the problem of determining the disassembly schedule (quantity and timing) of products in order to satisfy the demand of their parts or components over a finite planning horizon. The objective is to minimize the sum of set-up, disassembly operation, and inventory holding costs. As an extension of the uncapacitated versions of the problem, we consider the resource capacity restrictions over the planning horizon. An integer program is suggested to describe the problem mathematically, and to solve the problem, a heuristic is developed using a Lagrangean relaxation technique together with a method to find a good feasible solution while considering the trade-offs among different costs. The effectiveness of the algorithm is tested on a number of randomly generated problems and the test results show that the heuristic suggested in this paper can give near optimal solutions within a short amount of computation time.
引用
收藏
页码:1231 / 1240
页数:10
相关论文
共 50 条
  • [31] PERSONNEL SCHEDULING USING HEURISTIC-SEARCH AND CONSTRAINTS
    POLLACK, RB
    EXPERT SYSTEMS AND THE LEADING EDGE IN PRODUCTION AND OPERATIONS MANAGEMENT: PROCEEDINGS OF THE THIRD INTERNATIONAL CONFERENCE, 1989, : 567 - 575
  • [32] A fast heuristic for quay crane scheduling with interference constraints
    Christian Bierwirth
    Frank Meisel
    Journal of Scheduling, 2009, 12 : 345 - 360
  • [33] A HEURISTIC SCHEDULING OF INDEPENDENT TASKS WITH BOTTLENECK RESOURCE CONSTRAINTS
    WANG, QZ
    LEISS, EL
    SIAM JOURNAL ON COMPUTING, 1995, 24 (02) : 235 - 241
  • [34] AN ITERATIVE HEURISTIC FOR SCHEDULING GRID WORKFLOWS WITH BUDGET CONSTRAINTS
    Yuan, Ying-Chun
    Wang, Ke-Jian
    Sun, Xin-Sheng
    Guo, Tao
    PROCEEDINGS OF 2009 INTERNATIONAL CONFERENCE ON MACHINE LEARNING AND CYBERNETICS, VOLS 1-6, 2009, : 1700 - 1705
  • [35] A Lagrangian heuristic for satellite range scheduling with resource constraints
    Marinelli, Fabrizio
    Nocella, Salvatore
    Rossi, Fabrizio
    Smriglio, Stefano
    COMPUTERS & OPERATIONS RESEARCH, 2011, 38 (11) : 1572 - 1583
  • [36] A fast heuristic for quay crane scheduling with interference constraints
    Bierwirth, Christian
    Meisel, Frank
    JOURNAL OF SCHEDULING, 2009, 12 (04) : 345 - 360
  • [37] A Genetic Algorithm for Disassembly Scheduling with Assembly Product Structure
    Gao, Nan
    Chen, Weida
    IEEE/SOLI'2008: PROCEEDINGS OF 2008 IEEE INTERNATIONAL CONFERENCE ON SERVICE OPERATIONS AND LOGISTICS, AND INFORMATICS, VOLS 1 AND 2, 2008, : 2238 - 2243
  • [38] Approximating Scheduling Machines with Capacity Constraints
    Zhang, Chi
    Wang, Gang
    Liu, Xiaoguang
    Liu, Jing
    FRONTIERS IN ALGORITHMICS, PROCEEDINGS, 2009, 5598 : 283 - 292
  • [39] An optimal algorithm for disassembly scheduling with assembly product structure
    Kim, HJ
    Lee, DH
    Xirouchakis, P
    KI2005: ADVANCES IN ARTIFICIAL INTELLIGENCE, PROCEEDINGS, 2005, 3698 : 235 - 248
  • [40] MODELING OF SUPERSCALAR INSTRUCTION SCHEDULING AND ANALYSIS OF A HEURISTIC SCHEDULING ALGORITHM
    CHOU, HC
    CHUNG, CP
    BIT, 1993, 33 (03): : 354 - 371