Ignitor plasma chamber, first wall and remote handling maintenance

被引:0
|
作者
Cucchiaro, A. [1 ]
Bianchi, A. [2 ]
Celentano, G. [1 ]
Crescenzi, C. [1 ]
Coletti, A. [1 ]
Coppi, B.
Frosi, P. [1 ]
Galbiati, L. [1 ]
Lucca, F.
Marin, A.
Mazzone, G. [1 ]
Parodi, B.
Pizzuto, A. [1 ]
Ramogida, G. [1 ]
Roccella, M. [1 ]
机构
[1] Assoc ENEA Euratom Fus, Rome, Italy
[2] Ansaldo Ricerche, Genoa, Italy
关键词
D O I
暂无
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
The upgraded design of the Plasma Chamber (PC) and of the First Wall (FW) system consider the updated scenarios for IGNITOR [1] [2] vertical plasma disruption (VDE). The electromagnetic (EM) loads are so large to require a dynamic elastic-plastic structural analysis of the PC. A 360 degrees PC torus has been modeled to take into account the toroidal asymmetry of the halo current as well as the lateral EM loads. The PC wall thickness reduces the displacements within the clearance with toroidal coil. The PC low-cycle fatigue analysis results in a lifetime longer than the number of disruption events at the maximum performance.
引用
收藏
页码:316 / 319
页数:4
相关论文
共 50 条
  • [1] Design of plasma chamber for ignitor tokamak
    Cucchiaro, A
    Bianchi, A
    Capriccioli, A
    Celentano, G
    Crescenzi, C
    Frosi, P
    Linari, M
    Lucca, F
    Marin, A
    Mazzone, G
    Parodi, B
    Pizzuto, A
    Zanotelli, G
    Ramogida, G
    Roccella, M
    Sanguinetti, G
    20TH IEEE/NPSS SYMPOSIUM ON FUSION ENGINEERING, PROCEEDINGS, 2003, : 148 - 151
  • [2] Remote handling maintenance of ITER
    Haange, R
    NUCLEAR FUSION, 1999, 39 (11Y) : 2043 - 2050
  • [3] Remote handling maintenance of ITER
    Haange, R.
    Nuclear Fusion, 1999, 39 (Special Issu): : 2043 - 2050
  • [4] Ignitor plasma chamber structural design with dynamic loads due to plasma disruption event
    Cucchiaro, A
    Bianchi, A
    Coppi, B
    Crescenzi, C
    Linari, M
    Lucca, F
    Marin, A
    Mazzone, G
    Parodi, B
    Pizzuto, A
    Ramogida, G
    Roccella, M
    Sanguinetti, GP
    FUSION ENGINEERING AND DESIGN, 2005, 75-79 : 511 - 517
  • [5] Development of bolting tool for remote handling of ITER first wall central bolt
    Noguchi, Yuto
    Nakata, Kentaro
    Takeda, Nobukazu
    FUSION ENGINEERING AND DESIGN, 2021, 164
  • [6] The SPES target chamber remote handling system
    Vasquez, J.
    Oboe, R.
    Andrighetto, A.
    Cristofolini, I.
    Guerzoni, M.
    Margotti, A.
    Meneghetti, G.
    Scarpa, D.
    Bertocco, M.
    Prete, G.
    2013 IEEE INTERNATIONAL CONFERENCE ON MECHATRONICS (ICM), 2013,
  • [7] Transient behavior of the Ignitor plasma chamber under vertical displacement and halo current event
    Mazzone, G
    Pizzuto, A
    17TH IEEE/NPSS SYMPOSIUM ON FUSION ENGINEERING, VOLS 1 AND 2, 1998, : 96 - 99
  • [8] Remote handling and maintenance of ITER in-vessel components
    Burgess, T.
    Haange, R.
    Hattori, Y.
    Heckendorn, F.
    Ozaki, F.
    Shibanuma, K.
    Tesini, A.
    Herndon, J.
    Janeschitz, G.
    Martin, E.
    Maisonnier, D.
    Sironi, M.
    Tada, E.
    Fusion Technology, 1998, 34 (3 pt 2): : 1144 - 1150
  • [9] Development of Virtual Remote Handling Maintenance Planning Framework
    Sun, Z. Z.
    Guo, J. W.
    Tang, H.
    Chen, H. B.
    Zhang, Z. C.
    Li, R. Y.
    INTERNATIONAL CONFERENCE ON ADVANCED MANAGEMENT SCIENCE AND INFORMATION ENGINEERING (AMSIE 2015), 2015, : 649 - 655
  • [10] Multilayered Pipe Cutting Test for Remote Handling Maintenance
    Chen, Haibin
    Guo, Jianwen
    Sun, Zhenzhong
    Jia, Xuejun
    Tang, Hong
    SCIENCE AND TECHNOLOGY OF NUCLEAR INSTALLATIONS, 2015, 2015