A Logic-based Decomposition Approach for Multi-Period Network Interdiction Models

被引:21
|
作者
Enayaty-Ahangar, Forough [1 ]
Rainwater, Chase E. [2 ]
Sharkey, Thomas C. [3 ]
机构
[1] Univ Wisconsin Madison, 3261 Mech Engn Bldg, Madison, WI 53706 USA
[2] Univ Arkansas, Bell Engn Ctr 4166, Fayetteville, AR 72701 USA
[3] Rensselaer Polytech Inst, Ctr Ind Innovat, 110 8th St,Suite 5015, Troy, NY 12180 USA
基金
美国国家科学基金会;
关键词
Large-scale optimization; Scheduling; Multi-period Network Interdiction; Maximum Flow Problem; Decomposition Approach; Constraint Programming; MACHINE SCHEDULING PROBLEM;
D O I
10.1016/j.omega.2018.08.006
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This research details the creation of a large-scale optimization approach for solving an application of a multi-period bilevel network interdiction problem (NIP). In this class of multi-period NIP, interdiction activities must be scheduled to minimize the cumulative maximum flow over a finite time horizon. A logic-based decomposition (LBD) approach is proposed that utilizes constraint programming to exploit the scheduling nature of this multi-period NIP. Computational results-comparing solutions obtained using the proposed approach versus traditional mixed-integer programming approach-suggest that the LBD approach is more efficient in finding solutions for medium to large problem instances. (C) 2018 Elsevier Ltd. All rights reserved.
引用
收藏
页码:71 / 85
页数:15
相关论文
共 50 条
  • [21] Decomposition Based Refinement for the Network Interdiction Problem
    Matta, Krish
    Liu, Xiaoyuan
    Safro, Ilya
    [J]. 2023 IEEE HIGH PERFORMANCE EXTREME COMPUTING CONFERENCE, HPEC, 2023,
  • [22] An efficient heuristic approach for a multi-period logistics network redesign problem
    M. T. Melo
    S. Nickel
    F. Saldanha-da-Gama
    [J]. TOP, 2014, 22 : 80 - 108
  • [23] An efficient heuristic approach for a multi-period logistics network redesign problem
    Melo, M. T.
    Nickel, S.
    Saldanha-da-Gama, F.
    [J]. TOP, 2014, 22 (01) : 80 - 108
  • [24] A slacks-based measure approach for efficiency decomposition in multi-period two-stage systems
    Esfidani, Samaneh
    Lotfi, Farhad Hosseinzadeh
    Razavyan, Shabnam
    Ebrahimnejad, Ali
    [J]. RAIRO-OPERATIONS RESEARCH, 2020, 54 (06) : 1657 - 1671
  • [25] A retrospective multi-period sampling approach
    DelosSantos, P
    Burke, RJ
    Tien, JM
    [J]. SMC '97 CONFERENCE PROCEEDINGS - 1997 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN, AND CYBERNETICS, VOLS 1-5: CONFERENCE THEME: COMPUTATIONAL CYBERNETICS AND SIMULATION, 1997, : 1781 - 1786
  • [26] An utilities based approach for multi-period dynamic portfolio selection
    Yang, Guoliang
    Huang, Siming
    Chen, Wei
    [J]. JOURNAL OF SYSTEMS SCIENCE AND SYSTEMS ENGINEERING, 2007, 16 (03) : 277 - 286
  • [27] Recursive logic-based Benders' decomposition for multi-mode outpatient scheduling
    Riise, Atle
    Mannino, Carlo
    Lamorgese, Leonardo
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2016, 255 (03) : 719 - 728
  • [28] Multi-period risk management using fuzzy logic
    Rubinson, T
    [J]. INTERNATIONAL JOURNAL OF UNCERTAINTY FUZZINESS AND KNOWLEDGE-BASED SYSTEMS, 1996, 4 (05) : 449 - 466
  • [29] A Model-Based Approach and Analysis for Multi-Period Networks
    Hosseini, Seyed Ahmad
    [J]. JOURNAL OF OPTIMIZATION THEORY AND APPLICATIONS, 2013, 157 (02) : 486 - 512
  • [30] An utilities based approach for multi-period dynamic portfolio selection
    Guoliang Yang
    Siming Huang
    Wei Chen
    [J]. Journal of Systems Science and Systems Engineering, 2007, 16 : 277 - 286