A multi-agent system for decentralized multi-project scheduling with resource transfers

被引:76
|
作者
Adhau, Sunil [1 ]
Mittal, M. L. [1 ]
Mittal, Abhinav [1 ]
机构
[1] Malaviya Natl Inst Technol, Dept Mech Engn, Jaipur 302017, Rajasthan, India
关键词
Decentralized multi-project scheduling; Multi-agent system; Resource transfer time; Combinatorial bidding and auction; Distributed negotiations; Heuristic algorithms; AUCTION;
D O I
10.1016/j.ijpe.2013.08.013
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The companies dealing with multiple projects are geographically distributed at different locations. These projects require local (always available to the concerned project) and global (shared among the projects) resources that are available in limited quantity. The global resources are generally required to be transferred physically among the projects, consuming significant amounts of both time and cost. The existing multi-agent systems for decentralized resource constrained multi-project scheduling problem (DRCMPSP) do not consider the resource transfer time and related cost for execution and control. We introduce DRCMPSP-RT that explicitly considers the transfer of shared global resources. This paper proposes a novel distributed multi-agent system using auctions based negotiation (DMAS/RIA) approach for the resource intervals and allocating multiple different types of shared resources amongst multiple competing projects. To incorporate this feature the resources are planned to transfer in advance for the eligible successor activities to schedule within the current time. The proposed approach can solve complex large-sized multi-project instances without any limiting assumptions regarding the number of activities, shared resources or the number of projects. The DMAS/RIA is tested on standard set of 140 problem instances. Computational experiments compare the presented managerial approach with two transfer time neglecting approaches. The result found the relative GAP with an average of 33.43% with respect to average project delay (APD). Whereas, the percentage gap of total makespan (TMS) is obtained with an average of 16.52%. The result proves the impact of resource transfer time on project delay and increase in multi-project duration that can be minimized by project managers considering it in planning phase. (C) 2013 Elsevier B.V. All rights reserved.
引用
收藏
页码:646 / 661
页数:16
相关论文
共 50 条
  • [21] A LEARNING AGENT FOR A MULTI-AGENT SYSTEM FOR PROJECT SCHEDULING IN CONSTRUCTION
    Wenzler, Florian
    Guenthner, Willibald A.
    [J]. PROCEEDINGS - 30TH EUROPEAN CONFERENCE ON MODELLING AND SIMULATION ECMS 2016, 2016, : 11 - 17
  • [22] Decentralized Multi-Project Scheduling via Multi-Unit Combinatorial Auction
    Song, Wen
    Kang, Donghun
    Zhang, Jie
    Xi, Hui
    [J]. AAMAS'16: PROCEEDINGS OF THE 2016 INTERNATIONAL CONFERENCE ON AUTONOMOUS AGENTS & MULTIAGENT SYSTEMS, 2016, : 836 - 844
  • [23] Multi-project scheduling in a construction environment with resource constraints
    Stephenson, P
    Ying, Y
    [J]. SYSTEM-BASED VISION FOR STRATEGIC AND CREATIVE DESIGN, VOLS 1-3, 2003, : 2251 - 2255
  • [24] An Auction-based Approach for Decentralized Multi-Project Scheduling
    Song, Wen
    [J]. AAMAS'16: PROCEEDINGS OF THE 2016 INTERNATIONAL CONFERENCE ON AUTONOMOUS AGENTS & MULTIAGENT SYSTEMS, 2016, : 1518 - 1519
  • [25] Software multi-project resource scheduling: A comparative analysis
    Dong, Fei
    Li, Mingshu
    Zhao, Yuzhu
    Li, Juan
    Yang, Ye
    [J]. MAKING GLOBALLY DISTRIBUTED SOFTWARE DEVELOPMENT A SUCCESS STORY, 2008, 5007 : 63 - 75
  • [26] Multi-mode resource constrained multi-project scheduling and resource portfolio problem
    Besikci, Umut
    Bilge, Umit
    Ulusoy, Gunduz
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2015, 240 (01) : 22 - 31
  • [27] A MULTI-AGENT ARCHITECTURE FOR PROJECT SCHEDULING
    Bodea, Constanta Nicoleta
    Badea, Ileana Ruxandra
    Mogos, Radu-Ioan
    [J]. PROCEEDINGS OF THE 6TH INTERNATIONAL CONFERENCE ON BUSINESS EXCELLENCE, VOL 1, 2011, : 64 - 67
  • [28] A multi-agent optimization algorithm for resource constrained project scheduling problem
    Zheng, Xiao-long
    Wang, Ling
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2015, 42 (15-16) : 6039 - 6049
  • [29] A multi-unit combinatorial auction based approach for decentralized multi-project scheduling
    Wen Song
    Donghun Kang
    Jie Zhang
    Hui Xi
    [J]. Autonomous Agents and Multi-Agent Systems, 2017, 31 : 1548 - 1577
  • [30] A survey in the resource-constrained project and multi-project scheduling problems
    Ben Issa, Samer
    Tu, Yiliu
    [J]. JOURNAL OF PROJECT MANAGEMENT, 2020, 5 (02) : 117 - 138