Deep excavation in stiff clay:: design, construction and monitoring

被引:0
|
作者
Szepesházi, R [1 ]
Radványi, L [1 ]
Szörényi, J [1 ]
机构
[1] Szechenyi Istvan Univ Appl Sci, Gyor, Hungary
关键词
D O I
暂无
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
Design, construction and monitoring methods and experiences of 12..18,5 m deep excavations for a business and office center in Budapest are presented. Anchored pile walls and steep slope nailed and protected by shotcrete were used for supporting in a stiff overconsolidated clay. Displacements, anchor forces and groundwater levels were measured. The main experience was the occurrence of quite large wall movements caused by deformation of soil zones behind and in front of wall.
引用
收藏
页码:1261 / 1264
页数:4
相关论文
共 50 条
  • [41] Novel Excavation and Construction Method for a Deep Shaft Excavation in Ultrathick Aquifers
    Cao, Chengyong
    Shi, Chenghua
    Liu, Linghui
    Liu, Jianwen
    Lei, Mingfeng
    Lin, Yuexiang
    Ye, Yichao
    ADVANCES IN CIVIL ENGINEERING, 2019, 2019
  • [42] Design and construction of excavation for Shanghai Metro
    Liu, JH
    BIG DIGS AROUND THE WORLD, 1998, (86): : 103 - 123
  • [43] Design and construction of deep excavation engineering adjacent to the subway tunnel in Shanghai soft soil
    Li Jinjun
    Wang Weidong
    Tan Ke
    ADVANCES IN TRANSPORTATION GEOTECHNICS II, 2012, : 803 - 810
  • [44] Design and construction processing example of inadequate embedded depth of retaining piles in deep excavation
    Dai, Ming
    Deng, Min
    Zhang, Zhi
    Wu, Li-Sheng
    Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2014, 36 : 225 - 230
  • [45] INFLUENCE OF CONSTRUCTION TECHNIQUE ON THE PERFORMANCE OF A BRACED EXCAVATION IN MARINE CLAY
    SMITH, IM
    HO, DKH
    INTERNATIONAL JOURNAL FOR NUMERICAL AND ANALYTICAL METHODS IN GEOMECHANICS, 1992, 16 (12) : 845 - 867
  • [46] Queensberry House, London: A case study of the prediction and monitoring of settlements during the construction of a deep excavation
    Scott, P
    Talby, R
    den Hartog, N
    BEYOND 2000 IN COMPUTATIONAL GEOTECHNICS: 10 YEARS OF PLAXIS INTERNATIONAL, 1999, : 163 - 175
  • [47] Application of Hydrostatic Leveling System in Metro Monitoring for Construction Deep Excavation above Shield Tunnel
    Yin, Zhizheng
    MEASUREMENT TECHNOLOGY AND ENGINEERING RESEARCHES IN INDUSTRY, PTS 1-3, 2013, 333-335 : 1509 - 1513
  • [48] Zoned Excavation of an Oversized Pit Close to an Existing Metro Line in Stiff Clay: Case Study
    Tan, Yong
    Li, Xiang
    Kang, Zhijun
    Liu, Junxi
    Zhu, Yanbing
    JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES, 2015, 29 (06)
  • [49] Finite element modelling of a deep excavation in Boston Blue Clay
    Elia, Gaetano
    Rouainia, Mohamed
    Panayides, Stylianos
    VI ITALIAN CONFERENCE OF RESEARCHERS IN GEOTECHNICAL ENGINEERING, CNRIG2016 - GEOTECHNICAL ENGINEERING IN MULTIDISCIPLINARY RESEARCH: FROM MICROSCALE TO REGIONAL SCALE, 2016, 158 : 242 - 247
  • [50] Excavation works in stiff jointed clay material: examples from the Trubi formation, southern Italy
    Segato, David
    Scarpelli, Giuseppe
    Fruzzetti, Viviene M. E.
    Ruggeri, Paolo
    Vita, Alessandro
    Paternesi, Alessandra
    LANDSLIDES, 2015, 12 (04) : 721 - 730