共 50 条
- [21] Clear water scour analysis around groynes and bridge abutments RIVER FLOW 2006, VOLS 1 AND 2, 2006, : 1749 - +
- [22] Generalized Approach for Clear-Water Scour at Bridge Foundation Elements J. Hydraul. Eng., 2007, 11 (1229-1240):
- [24] Time evolution of scour and deduction of the required minimum test duration for a clear-water scour test at a bridge pier PROCEEDINGS OF THE 4TH IASME/WSEAS INTERNATIONAL CONFERENCE ON WATER RESOURCES, HYDRAULICS AND HYDROLOGY, 2009, : 168 - 174
- [30] Clear-Water Scour at Pile Groups JOURNAL OF HYDRAULIC ENGINEERING, 2013, 139 (10) : 1089 - 1098