Stability Analysis of TBM Tunnel Undercrossing Existing High-Speed Railway Tunnel: A Case Study from Yangtaishan Tunnel of Shenzhen Metro Line 6

被引:9
|
作者
Zhao, Mingji [1 ]
Cheng, Yun [2 ,3 ]
Song, Zhanping [2 ,3 ]
Wang, Tong [2 ,3 ]
Zhang, Yuwei [2 ,3 ]
Gong, Yitong [2 ]
Song, Yuncai [4 ]
机构
[1] Xian Univ Architecture & Technol, Sch Mech & Elect Engn, Xian 710055, Peoples R China
[2] Xian Univ Architecture & Technol, Sch Civil Engn, Xian 710055, Peoples R China
[3] Shaanxi Key Lab Geotech & Underground Space Engn, Xian 710055, Peoples R China
[4] China Railway Construct Bridge Engn Bur Grp Co Lt, Tianjin 300300, Peoples R China
关键词
D O I
10.1155/2021/6674862
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
During the construction of the underpass of a new tunnel, the excavation unloading effect disturbs surrounding rock masses and promotes surrounding rock deformation, inevitably changing stress and displacement in the existing tunnel. Taking Yangtaishan tunnel excavation of Shenzhen Metro Line 6 as an engineering example, effects of excavation programs of left and right lines on the deformation characteristics of newly excavated and existing tunnels were evaluated based on Midas numerical model and priority excavation advantages of the left line were determined. The settlement and horizontal deformation characteristics of the existing tunnel were analyzed using the construction monitoring method. Results showed that maximum settlement and horizontal deformation of the existing tunnel were 1.35 and 0.23 mm, respectively. Settlement of invert and inverted top along axis direction was from growth to decline, and then a V-shaped settlement trough was formed with maximum settlement values of 1.36 and 0.97 mm, respectively. Maximum settlement and uplift of the newly built tunnel appeared on the upper and bottom parts of invert, respectively. In the newly built tunnel segments, the top settlement was dominated and deformation was mainly distributed in both side areas. At the top of the existing tunnel segment, convergence settlement was 3.09 mm and settlement rate was slow first which was accelerated, then stabilized, and finally slowed down again which was opposite to the uplift development trend of the bottom of tunnel segment. The top of the existing tunnel segment showed four settlement stages, slow, rapid, stable, and slow settlement stages. Compared with the right line, preferential excavation of the left line had obvious advantages in terms of tunnel stability. The unloading effect of TBM excavation created vault settlement in the existing tunnels where actual settlement values were 1.12 and 1.13 times, which theoretically calculated settlement. The horizontal deformation of the existing tunnel was varied first linearly and then nonlinearly with maximum deformation in the convergence stage of 1.47 mm.
引用
收藏
页数:18
相关论文
共 50 条
  • [21] Study evolvement of high-speed railway tunnel aerodynamic effect in China
    Ma, W.-B. (dwangfei@163.com), 1600, Chang'an University (12):
  • [22] Deformation characteristics and safety assessment of a high-speed railway induced by undercutting metro tunnel excavation
    Wangping Qian
    Taiyue Qi
    Yunjian Zhao
    Yizhou Le
    Haiyang Yi
    Journal of Rock Mechanics and Geotechnical Engineering, 2019, 11 (01) : 88 - 98
  • [23] Deformation characteristics and safety assessment of a high-speed railway induced by undercutting metro tunnel excavation
    Qian, Wangping
    Qi, Taiyue
    Zhao, Yunjian
    Le, Yizhou
    Yi, Haiyang
    JOURNAL OF ROCK MECHANICS AND GEOTECHNICAL ENGINEERING, 2019, 11 (01) : 88 - 98
  • [24] Stability Analysis of Construction Process of New Tunnel Passing through High-speed Railway Foundation
    Zhang, Fei
    Journal of Railway Engineering Society, 2022, 39 (05) : 53 - 58
  • [25] Jin Shazhou tunnel on the high-speed railway line Wuhan-Guangzhou - one of the most challenging tunnel constructions in China
    Stingl, V.
    Eidelsburger, St.
    Fruehauf, I.
    Hangebrock, D.
    BAUINGENIEUR, 2010, 85 : 105 - 111
  • [26] Deformation control strategies for shield tunnel underpassing viaduct of high-speed railway: A case study
    Xu, Qiang
    Xu, Shuo
    Li, Yong
    Zhang, Yahui
    Tian, Haojie
    Zhao, Mingjian
    JOURNAL OF ENGINEERING RESEARCH, 2025, 13 (01): : 390 - 398
  • [27] First application of the Pretunnel system for the construction of a tunnel in the high-speed railway line in Italy
    Brino, L
    Pagliacci, F
    Campa, E
    Pelizza, S
    TUNNELS FOR PEOPLE, VOLS 1 AND 2, 1997, : 311 - 316
  • [28] Dynamic Slope Stability Subject to Blasting Vibrations: a Case Study of the Jakarta-Bandung High-Speed Railway Tunnel
    Widodo
    Phanjaya, Hermawan
    Prassetyo, Simon Heru
    Simangunsong, Ganda Marihot
    Rai, Made Astawa
    Wattimena, Ridho Kresna
    TRANSPORTATION INFRASTRUCTURE GEOTECHNOLOGY, 2023, 10 (05) : 774 - 794
  • [29] Dynamic Slope Stability Subject to Blasting Vibrations: a Case Study of the Jakarta-Bandung High-Speed Railway Tunnel
    Hermawan Widodo
    Simon Heru Phanjaya
    Ganda Marihot Prassetyo
    Made Astawa Simangunsong
    Ridho Kresna Rai
    Transportation Infrastructure Geotechnology, 2023, 10 : 774 - 794
  • [30] Comparative study on the wind characteristics of tunnel-bridge and tunnel-flat ground infrastructures on high-speed railway
    Yang, Weichao
    Liu, Yikang
    Deng, E.
    He, Xuhui
    Lei, Mingfeng
    Zou, Yunfeng
    JOURNAL OF WIND ENGINEERING AND INDUSTRIAL AERODYNAMICS, 2022, 226