Design and implementation of modern elevator group control system

被引:0
|
作者
Chen, Zhi-Ming [1 ]
Luo, Fei [1 ]
Xu, Yu-Ge [1 ]
Cao, Jian-Zhong [1 ]
机构
[1] South China Univ Technol, Coll Automat Sci & Engn, Guangzhou 510640, Guangdong, Peoples R China
基金
中国国家自然科学基金;
关键词
elevator group control system; traffic prediction; traffic pattern recognition; support vector machine; hall call assignment;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
The design and implementation of a modern elevator group control system (EGCS) is introduced in this paper. The basic considerations of designing an EGCS are discussed, including related system parameters, evaluation criterions and traffic patterns. Least squares support vector machine algorithm is employed for traffic prediction. Using multi-support vector machine, the traffic pattern recognition is accomplished, then based on that recognition, the control strategies are generated. In the hall call assignment, the re-scheduling ability is achieved by the elevator suitability re-evaluation mechanism. A comparison with an older model demonstrates the effectiveness of the proposed EGCS.
引用
收藏
页码:676 / +
页数:3
相关论文
共 50 条
  • [31] Elevator group supervisory control system using neural networks
    Fujitec Co, Ltd, Osaka, Japan
    Elevator World, 1600, 2 (81-86):
  • [32] A traffic flow forecasting method of elevator group control system
    Zong, Q.
    Yue, Y.
    Xi Tong Gong Cheng Yu Dian Zi Ji Shu/Systems Engineering and Electronics, 2001, 23 (07): : 103 - 105
  • [33] Metaheuristic algorithms for elevator group control system: a holistic review
    Hanif, Mohammad
    Mohammad, Nur
    SOFT COMPUTING, 2023, 27 (21) : 15905 - 15936
  • [34] An intelligent optimal dispatching approach for elevator group control system
    Qun, Zong
    Ling, Tong
    Elevator World, 2004, 52 (06): : 50 - 52
  • [35] Metaheuristic algorithms for elevator group control system: a holistic review
    Mohammad Hanif
    Nur Mohammad
    Soft Computing, 2023, 27 : 15905 - 15936
  • [36] Research on Scheduling Algorithm Based on Elevator Group Control System
    Zhang, XueXia
    Fu, An Ying
    Zhang, JinBo
    PROCEEDINGS OF THE 2017 7TH INTERNATIONAL CONFERENCE ON ADVANCED DESIGN AND MANUFACTURING ENGINEERING (ICADME 2017), 2017, 136 : 237 - 243
  • [37] Elevator Group Control System Based on ARM plus DSP
    Liu, Qin
    Liu, Wenjie
    Liu, Lihua
    CJCM: 5TH CHINA-JAPAN CONFERENCE ON MECHATRONICS 2008, 2008, : 198 - 200
  • [38] Research on optimal scheduling strategy for elevator group control system
    Li Yan-ping
    Feng Xing-mei
    Chen Liang
    Proceedings of the 2007 Chinese Control and Decision Conference, 2007, : 849 - +
  • [39] Supervisory control for elevator group by using fuzzy expert system
    Kaneko, M
    Ishikawa, T
    Sogawa, Y
    IECON '97 - PROCEEDINGS OF THE 23RD INTERNATIONAL CONFERENCE ON INDUSTRIAL ELECTRONICS, CONTROL, AND INSTRUMENTATION, VOLS. 1-4, 1997, : 370 - 376
  • [40] Fair and Effective Elevator Car Dispatching Method in Elevator Group Control System using Cameras
    Yamauchi, Tomoki
    Ide, Rina
    Sugawara, Toshiharu
    KNOWLEDGE-BASED AND INTELLIGENT INFORMATION & ENGINEERING SYSTEMS (KES 2019), 2019, 159 : 455 - 464