Dynamic behavior of pergola bridge decks of high-speed railways

被引:5
|
作者
Ugarte, Jokin [1 ]
Carnerero, Antonio [2 ]
Millanes, Francisco [1 ,2 ]
机构
[1] IDEAM SA, 19 Jorge Juan St, Madrid 28001, Spain
[2] Univ Politecn Madrid, ETS Ingenieros Caminos Canales & Puertos, Dept Continuum Mech & Struct, 3 Prof Aranguren St, E-28040 Madrid, Spain
关键词
pergola bridge; high-speed rail; dynamic analysis; railway bridge; two dimensional structures; skew angle; CABLE-STAYED BRIDGES; VIBRATION;
D O I
10.12989/sem.2017.61.1.091
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper analyzes the dynamic behavior of the deck of pergola bridges affected by moving loads, specifically highspeed trains. Due to their characteristic advantages, pergola bridges have become a widely used structural typology on highspeed railways. In spite of such wide-spread use, there are few technical bibliographies published in this field. The first part of this paper develops a simple analytical methodology to study the complex dynamic behavior of these double dimensional structures. The second part compares the results obtained by the proposed formulae and the dynamic response obtained with different and gradually more complex FE models. The results obtained by the analytical model are in close agreement with those obtained by the FE models, demonstrating its potential application in the early design stages of this kind of structure.
引用
下载
收藏
页码:91 / 103
页数:13
相关论文
共 50 条
  • [21] Modeling of dynamic train-bridge interaction in high-speed railways (vol 226, pg 2473, 2015)
    Salcher, Patrick
    Adam, Christoph
    ACTA MECHANICA, 2015, 226 (10) : 3561 - 3561
  • [22] Dynamic Modeling and Application of a Vehicle-Track-Bridge System Subjected to Track Alignment for High-Speed Railways
    Long, Xuyou
    Shi, Jin
    Wang, Yingjie
    Liu, Xingyu
    KSCE JOURNAL OF CIVIL ENGINEERING, 2024, : 5582 - 5592
  • [23] Shear behavior of stud connectors in steel bridge deck and ballastless track structural systems of high-speed railways
    Cui, Chenxing
    Song, Li
    Liu, Ran
    Liu, Hubing
    Yu, Zhiwu
    Jiang, Lizhong
    CONSTRUCTION AND BUILDING MATERIALS, 2022, 341
  • [24] Dynamic responses of high-speed railway continuous bridge
    Wang, Qingbo
    Wang, Sheng
    Xu, Kebin
    Xia, He
    Beifang Jiaotong Daxue Xuebao/Journal of Northern Jiaotong University, 1997, 21 (04): : 399 - 404
  • [25] ECONOMIC HIGH-SPEED RUNNING OF RAILWAYS
    JONES, S
    ELECTRONICS AND POWER, 1975, 21 (02): : 100 - 104
  • [26] Geotechnical aspects for high-speed railways
    Brandl, H
    Geotechnics in Pavement and Railway Design and Construction, 2004, : 117 - 132
  • [27] Brake systems for high-speed railways
    Kumabe, Ken-Ichi
    Toraibarojisuto/Journal of Japanese Society of Tribologists, 2013, 58 (07): : 462 - 466
  • [28] Gear systems for high-speed railways
    Ono, Hiroshi
    Toraibarojisuto/Journal of Japanese Society of Tribologists, 2013, 58 (07): : 473 - 478
  • [29] Exploring of Chinese High-Speed Railways
    Liu Youmei (Zhuzhou Electric Locomotive works
    Engineering Sciences, 2004, (01) : 7 - 14
  • [30] Internet of things for high-speed railways
    Zhong G.
    Xiong K.
    Zhong Z.
    Ai B.
    Intelligent and Converged Networks, 2021, 2 (02): : 115 - 132