Impact of information technology integration and lean/just-in-time practices on lead-time performance

被引:197
|
作者
Ward, Peter
Zhou, Honggeng
机构
[1] Univ New Hampshire, Whittemore Sch Business & Econ, Dept Decis Sci, Durham, NH 03824 USA
[2] Ohio State Univ, Fisher Coll Business, Dept Management Sci, Columbus, OH 43210 USA
关键词
D O I
10.1111/j.1540-5915.2006.00121.x
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Managers seeking to improve lead-time performance are challenged by how to balance resources and investments between process improvement achieved through lean/just-in-time (JIT) practices and information technology (IT) deployment. However, extant literature provides little guidance on this question. Motivated by both practical importance and lack of academic research, this article examines empirically the relationships among interfirm IT integration, intrafirm IT integration, lean/JIT practices, and lead-time performance using data from IndustryWeek's Census of Manufacturers (IndustryWeek, 2006). The results provide several new insights on the relationship between IT integration and lean/JIT practices. First, the study confirms that implementing lean/JIT practices significantly reduces lead time. Second, lean/JIT practices mediate the influence of IT integration on lead-time performance. This suggests that process improvements that result from lean/JIT practices are important contributors to the success of IT integration. Even companies that have experienced success in reducing lead time through lean/JIT practices may benefit from IT integration practices such as those embodied in enterprise resource planning systems. The findings provide managers with empirical evidence and a theoretical framework on the balance between lean/JIT and IT for effecting improvement in lead-time performance, thus offering practical guidance on this important question. Future research is needed to extend the lean/JIT practices in this study to supply chain practices and explore the relationship between supply chain practices and IT integration.
引用
收藏
页码:177 / 203
页数:27
相关论文
共 50 条
  • [41] Just-in-time practices in an unstable environment. A simulation study
    Ramudhin, Amar
    Rochette, Rene
    [J]. Proceedings of the International Conference on Just-in-Time Manufacturing Systems, 1600,
  • [42] The Impact of Duplicate Changes on Just-in-Time Defect Prediction
    Duan, Ruifeng
    Xu, Haitao
    Fan, Yuanrui
    Yan, Meng
    [J]. IEEE TRANSACTIONS ON RELIABILITY, 2022, 71 (03) : 1294 - 1308
  • [43] Special issue on just-in-time requirements engineering for software integration
    Niu, Nan
    Fernandez, Daniel Mendez
    [J]. JOURNAL OF INDUSTRIAL INFORMATION INTEGRATION, 2019, 14 : 1 - 2
  • [44] DYNAMIC INTEGRATION - SOME IDEAS FROM JUST-IN-TIME MANUFACTURING
    VAIL, RL
    [J]. COMPUTER INTEGRATED MANUFACTURING SYSTEMS, 1988, 1 (03): : 179 - 185
  • [45] The effect of lead-time on supply chain resilience performance
    Chang, Wei-Shiun
    Lin, Yu-Ting
    [J]. ASIA PACIFIC MANAGEMENT REVIEW, 2019, 24 (04) : 298 - 309
  • [46] The impact of context metrics on just-in-time defect prediction
    Kondo, Masanari
    German, Daniel M.
    Mizuno, Osamu
    Choi, Eun-Hye
    [J]. EMPIRICAL SOFTWARE ENGINEERING, 2020, 25 (01) : 890 - 939
  • [47] The impact of context metrics on just-in-time defect prediction
    Masanari Kondo
    Daniel M. German
    Osamu Mizuno
    Eun-Hye Choi
    [J]. Empirical Software Engineering, 2020, 25 : 890 - 939
  • [48] THE IMPACT OF JUST-IN-TIME INVENTORY SYSTEMS ON SMALL BUSINESSES
    SADHWANI, AT
    SARHAN, MH
    [J]. JOURNAL OF ACCOUNTANCY, 1987, 163 (01): : 118 - &
  • [49] Impact of just-in-time inventory systems on OEM suppliers
    Kros, John F.
    Falasca, Mauro
    Nadler, S. Scott
    [J]. INDUSTRIAL MANAGEMENT & DATA SYSTEMS, 2006, 106 (1-2) : 224 - 241
  • [50] External information sourcing and lead-time advantage in product innovation
    Van Criekingen, Kristof
    [J]. JOURNAL OF INTELLECTUAL CAPITAL, 2020, 21 (05) : 709 - 726