共 50 条
- [41] A parallel complete anytime procedure for project scheduling under multiple resource constraints [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 50 (1-4): : 353 - 362
- [42] A parallel complete anytime procedure for project scheduling under multiple resource constraints [J]. The International Journal of Advanced Manufacturing Technology, 2010, 50 : 353 - 362
- [45] Scheduling and optimal voltage selection with multiple supply voltages under resource constraints [J]. VLSI'03: PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON VLSI, 2003, : 272 - 278
- [49] Radio Resource Management of CoMP System in HetNet under Power and Backhaul Constraints [J]. KSII TRANSACTIONS ON INTERNET AND INFORMATION SYSTEMS, 2014, 8 (11): : 3876 - 3895