Application of Extenics in Evaluation of Risk of Dam

被引:3
|
作者
Shi Yongchao [1 ]
Cao Aiwu [1 ]
Wang Jin [1 ]
机构
[1] Hohai Univ, Coll Hydrol Water Resources & Hydraul, Nanjing 210098, Jiangsu, Peoples R China
关键词
risk of dam; extenics; matter element system; matter-element model;
D O I
10.4028/www.scientific.net/AMR.726-731.744
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
According to the extension of matter element, a quantitative evaluation model of dam risk analysis of multiple parameters is developed. Matter-element model was constructed to assess dam behavior by matter-element transform. The emergency capacity besides safety of dam and failure losses is taken into concerned during the analysis of risk of dam. Finally, a simple example shows that is more reasonable compared with traditional methods.
引用
收藏
页码:744 / 749
页数:6
相关论文
共 50 条
  • [41] Research on Evaluation Method of Voltage Sag Severity Based on Extenics
    Chang, Xiao
    Wang, Jinhao
    Wang, Shifeng
    Wang, Hao
    Wang, Kun
    Fan, Xingguan
    [J]. 2020 5TH ASIA CONFERENCE ON POWER AND ELECTRICAL ENGINEERING (ACPEE 2020), 2020, : 410 - 414
  • [42] A research on the evaluation of the risks of enterprises' logistics outsourcing based on the extenics
    Cao Qingkui
    Zhang Jie
    Wu Kan
    [J]. PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE ON RISK AND RELIABILITY MANAGEMENT, VOLS I AND II, 2008, : 300 - 303
  • [43] RESEARCH ON ROCKBURST PREDICTION WITH EXTENICS EVALUATION BASED ON ROUGH SET
    Qin, Sheng-Wu
    Chen, Jian-Ping
    Wang, Qing
    Qiu, Dao-Hong
    [J]. CONTROLLING SEISMIC HAZARD AND SUSTAINABLE DEVELOPMENT OF DEEP MINES: 7TH INTERNATIONAL SYMPOSIUM ON ROCKBURST AND SEISMICITY IN MINES (RASIM7), VOL 1 AND 2, 2009, : 937 - 944
  • [44] A connection cloud model coupled with extenics for water eutrophication evaluation
    Qiuyan Liu
    Mingwu Wang
    Tianlong Zhou
    Fengqiang Shen
    Juliang Jin
    [J]. Earth Science Informatics, 2019, 12 : 659 - 669
  • [45] Evaluation of the Instability Risk of the Dam Slopes Simulated with Monte Carlo method (Case Study: Alborz Dam)
    Alitabar, Abbas
    Noorzad, Reza
    Qolinia, Afshin
    [J]. GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2021, 39 (06) : 4237 - 4251
  • [46] Evaluation of the Instability Risk of the Dam Slopes Simulated with Monte Carlo method (Case Study: Alborz Dam)
    Abbas Alitabar
    Reza Noorzad
    Afshin Qolinia
    [J]. Geotechnical and Geological Engineering, 2021, 39 : 4237 - 4251
  • [47] Evaluation of Open-Pit Mine Security Risk Based on FAHP-Extenics Matter-Element Model
    Tao ZhiGang
    Zhao DongDong
    Yang XiaoJie
    Wang JiaMin
    Shu Yu
    [J]. GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2020, 38 (02) : 1653 - 1667
  • [48] Study of the Safety Evaluation of Urban Subway Operation Based on Extenics
    Bai, Shimei
    Sun, Hongsheng
    Zhao, Yongchun
    [J]. ADVANCED CONSTRUCTION TECHNOLOGIES, 2014, 919-921 : 878 - 882
  • [49] A connection cloud model coupled with extenics for water eutrophication evaluation
    Liu, Qiuyan
    Wang, Mingwu
    Zhou, Tianlong
    Shen, Fengqiang
    Jin, Juliang
    [J]. EARTH SCIENCE INFORMATICS, 2019, 12 (04) : 659 - 669
  • [50] Tribology Extenics Condition Evaluation Based on Matter Element Theory
    Zhao Chunhua
    Wu Gang
    Li Li
    Yang Weihua
    [J]. 2009 WASE INTERNATIONAL CONFERENCE ON INFORMATION ENGINEERING, ICIE 2009, VOL II, 2009, : 470 - 473