Special-design precast concrete beams for Sidney Lanier Bridge replacement project

被引:0
|
作者
Callicutt, E [1 ]
机构
[1] FIgg Construct Serv Inc, Brunswick, GA 31520 USA
关键词
D O I
10.3141/1696-07
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The Sidney Lanier Bridge Replacement Project is a $100 million undertaking in Brunswick, Georgia, that will lead to the replacement of an existing 40-year-old steel lift-span structure. The approach bridges that lead to the project's main-span unit consist of 16 spans of 54.9-m (180-ft), special-design, precast concrete beams as well as 14 spans of 36.6-m (120-ft) Type V AASHTO girders. The special-design beams are 2.3 m (7.5 ft) deep, are erected as simply supported members and are then made into two-span continuous units by longitudinal posttensioning, and are rigidly connected transversely with cast-in-place diaphragms. The riding surface is a cast-in-place concrete deck constructed on stay-in-place metal forms. The 54.9-m (180-ft) beams, supported by hollow tapered concrete piers with hammerhead caps, are founded on 1.2-m (48-in.) drilled shafts. Wet-hole construction methods with bentonite slurry were required for the drilled shafts. The bridge piers are over land and water, and large cofferdams were required to facilitate construction. Additionally, the sizes of the cast-in-place footings and hammerhead pier caps required mass concrete thermal considerations. The approach bridges lead to the main-span portion of the project, which will be a 762-m (2,500-ft) concrete, cable-stayed unit with a 381-m (1,250-ft) center span. The design, casting, and erection of these beams, and construction of the substructure, posed many challenges to the Georgia Department of Transportation designers and contractors. These beams are among the longest erected in Georgia.
引用
收藏
页码:48 / 51
页数:4
相关论文
共 50 条
  • [21] Implication of increased live loads on the design of precast concrete bridge girders
    Marti-Vargas, Jose R.
    PCI JOURNAL, 2013, : 147 - 148
  • [22] Implication of increased live loads on the design of precast concrete bridge girders
    Gerges, N., 1600, Precast/Prestressed Concrete Institute (57):
  • [23] Development of a rational design methodology for precast concrete slender spandrel beams
    Klein, Gary
    Rizkalla, Sami
    Zia, Paul
    Lucier, Greg
    PCI JOURNAL, 2012, : 182 - 186
  • [24] Implication of increased live loads on the design of precast concrete bridge girders
    Gerges, Nagib
    Gergess, Antoine N.
    PCI JOURNAL, 2012, : 78 - 95
  • [25] Analysis of safety cost structure in infrastructure project of precast of precast concrete bridge based on Work Breakdown Structure (WBS)
    Saputra, P. D.
    Latief, Y.
    INTERNATIONAL CONFERENCE ON INNOVATION IN ENGINEERING AND VOCATIONAL EDUCATION 2019 (ICIEVE 2019), PTS 1-4, 2020, 830
  • [26] Evaluation of precast pre-post-tensioned concrete bridge beams with the use of GPR method
    Slawski, Lukasz
    Kosno, Lukasz
    Swit, Grzegorz
    BRIDGES IN DANUBE BASIN 2016 - NEW TRENDS IN BRIDGE ENGINEERING AND EFFICIENT SOLUTION FOR LARGE AND MEDIUM SPAN BRIDGES, 2016, 156 : 443 - 450
  • [27] Behaviour and design of composite steel and precast concrete transom for railway bridge application
    Mirza, O.
    Talos, A.
    Hennessy, M.
    Kirkland, B.
    STRUCTURES, 2019, 21 : 111 - 121
  • [28] Horizontal Interface Shear Requirements for Precast Prestressed Concrete Bridge Beams with Slender Webs in Beam and Slab Bridge Constructions
    Slevin, M.
    O'Connor, A. J.
    MAINTENANCE, SAFETY, RISK, MANAGEMENT AND LIFE-CYCLE PERFORMANCE OF BRIDGES, 2018, : 1192 - 1199
  • [29] NEW EUROCODE 4 DESIGN RULES FOR COMPOSITE BEAMS WITH PRECAST CONCRETE SLABS
    Hicks, Stephen J.
    Braun, Matthias
    Markovic, Zlatko
    Way, James
    ce/papers, 2023, 6 (01) : 38 - 47
  • [30] Ocean City Longport replacement bridge requires precast concrete durability for harsh marine conditions
    Mumber, J
    Foster, DM
    Lambert, ED
    Saunders, CA
    PCI JOURNAL, 2003, 48 (06): : 32 - 45