Realtime scheduling for FMS based on fuzzy logic

被引:0
|
作者
Kong, Yaguang [1 ]
Gong, Xiangxin [2 ]
Wang, Jianzhong [1 ]
机构
[1] Hangzhou Dianzi Univ, Inst Informat & Control, Hangzhou 310037, Peoples R China
[2] Zhejiang Zheda Zhongzi Integrated Control Stock C, Hangzhou 310027, Peoples R China
来源
ICICIC 2006: FIRST INTERNATIONAL CONFERENCE ON INNOVATIVE COMPUTING, INFORMATION AND CONTROL, VOL 2, PROCEEDINGS | 2006年
关键词
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Flexible Manufacturing systems have been designed to meet market requirements, that demand products that are quality and ready to deliver. In order to meet the market requirements, the methodologies used in the FMS scheduling must consider some constraints. A realtime scheduling policy based on fuzzy logic is proposed in this work. The decision of which part will be the next to be processed should take into account some criteria that influences the performance of FMS. In order to test and validate the proposed approach, a shop floor was tested using the fuzzy system and also a FIFO rule to be compared.
引用
收藏
页码:195 / +
页数:2
相关论文
共 50 条
  • [41] PLANNING AND SCHEDULING IN AN FMS
    AANEN, E
    GAALMAN, GJ
    NAWIJN, WM
    ENGINEERING COSTS AND PRODUCTION ECONOMICS, 1989, 17 (1-4): : 89 - 97
  • [42] Developing a Fuzzy ANP Model for Selecting the Suitable Dispatching Rule for Scheduling a FMS
    Sadi-nezhad, S.
    Didehkhani, H.
    Seyedhosseini, S. M.
    IEEM: 2008 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-3, 2008, : 405 - +
  • [43] WORK SCHEDULING IN AN FMS
    CARRIE, AS
    PERERA, DTS
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1985, 36 (12) : 1161 - 1161
  • [44] Design of Tools Flow Based on Reusable Scheduling in FMS
    Bian, Peiying
    ADVANCES IN MATERIAL SCIENCE, MECHANICAL ENGINEERING AND MANUFACTURING, 2013, 744 : 491 - 494
  • [45] SCHEDULING PARTS IN AN FMS
    SARIN, SC
    DAREL, EM
    LARGE SCALE SYSTEMS IN INFORMATION AND DECISION TECHNOLOGIES, 1986, 11 (02): : 83 - 94
  • [47] FMS scheduling with knowledge based genetic algorithm approach
    Prakash, A.
    Chan, Felix T. S.
    Deshrnukh, S. G.
    EXPERT SYSTEMS WITH APPLICATIONS, 2011, 38 (04) : 3161 - 3171
  • [48] Multiprocessor Tasks Scheduling. Fuzzy Logic Approach
    Dorota, Dariusz
    NEW ADVANCES IN DEPENDABILITY OF NETWORKS AND SYSTEMS, DEPCOS-RELCOMEX 2022, 2022, 484 : 50 - 62
  • [49] Integrating Transportation Scheduling with Production Scheduling for FMS: An Agent-Based Approach
    Badr, Iman
    Schmitt, Fabian
    Goehner, Peter
    IEEE INTERNATIONAL SYMPOSIUM ON INDUSTRIAL ELECTRONICS (ISIE 2010), 2010, : 3539 - 3544
  • [50] A Fuzzy-Logic Based Coordinated Scheduling Technique for Inter-grid Architectures
    Azab, Abdulrahman
    Meling, Hein
    Davidrajuh, Reggie
    DISTRIBUTED APPLICATIONS AND INTEROPERABLE SYSTEMS (DAIS 2014), 2014, 8460 : 171 - 185