Optimization model for long-distance integrated transmission of wind farms and pumped-storage hydropower plants

被引:70
|
作者
Su, Chengguo [1 ]
Cheng, Chuntian [1 ]
Wang, Peilin [2 ]
Shen, Jianjian [1 ]
Wu, Xinyu [1 ]
机构
[1] Dalian Univ Technol, Inst Hydropower & Hydroinformat, Dalian 116024, Peoples R China
[2] Yellow River Conservancy Tech Inst, Sch Hydraul Engn, Kaifeng 475004, Peoples R China
基金
中国国家自然科学基金;
关键词
Integrated transmission; Wind farm; Pumped-storage hydropower plant; Wind power forecast errors; Mixed-integer linear programming; POWER; ENERGY; GENERATION; OPERATION; TECHNOLOGIES;
D O I
10.1016/j.apenergy.2019.03.080
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Long-distance and large-capacity wind power transmission from western and northern China to load centers through ultra-high voltage (UHV) transmission lines is an important and effective measure for large-scale wind power accommodation in China. This paper proposes a novel practical integrated transmission mode for a wind farm (WF) and a pumped-storage hydropower plant (PSHP). In order to cope with additional imbalance costs caused by deviations from the submitted day-ahead schedule and increase the total operational profit, an optimization model for the integrated transmission of a WF and a PSHP has been formulated. The forecast errors for wind power generation are modeled by a scenario analysis technique. Hydraulic constraints and the head effect on the performance of each pumped-storage hydropower unit (PSHU) in both generating and pumping modes have been considered. Through incorporating the nonlinearities, including constraints on the operation status of units and turbine performance curves, the model is converted into a mixed-integer linear programming (MILP) formulation using piecewise linear approximation techniques. Case studies demonstrate that the integrated transmission of the WF and PHSP can efficiently alleviate the negative effect of wind power fluctuations and significantly increase profit. Sensitivity analyses have been carried out to evaluate the effect of the penalty factor for energy imbalance and the electricity price mechanism in the receiving-end power grid on the overall performance of the WF-PSHP union.
引用
收藏
页码:285 / 293
页数:9
相关论文
共 50 条
  • [41] An integrated mathematical model of dynamic production and maintenance planning in pumped-storage hydroelectricity
    Asgari, Farid
    Jolai, Fariborz
    Movahedisobhani, Farzad
    JOURNAL OF MODELLING IN MANAGEMENT, 2022, 17 (04) : 1213 - 1240
  • [42] Pumped-storage hydropower plants with underground reservoir: Influence of air pressure on the efficiency of the Francis turbine and energy production
    Menendez, Javier
    Fernandez-Oro, Jesus M.
    Galdo, Monica
    Loredo, Jorge
    RENEWABLE ENERGY, 2019, 143 : 1427 - 1438
  • [43] Stochastic Day-Ahead Generation Scheduling With Pumped-Storage Stations and Wind Power Integrated
    Zheng, J. H.
    Quan, X. Y.
    Jing, Z. X.
    Wu, Q. H.
    2016 INTERNATIONAL CONFERENCE ON PROBABILISTIC METHODS APPLIED TO POWER SYSTEMS (PMAPS), 2016,
  • [44] A model for optimal scheduling of hydro thermal systems including pumped-storage and wind power
    Helseth, Arild
    Gjelsvik, Anders
    Mo, Birger
    Linnet, Ulfar
    IET GENERATION TRANSMISSION & DISTRIBUTION, 2013, 7 (12) : 1426 - 1434
  • [45] Frequency Control with Dead Band by Adjustable-Speed Pumped-Storage Generator for Power System with Wind Farms
    Tokida, Atsushi
    Tahara, Shuya
    Yoshida, Yuta
    Umemura, Atsushi
    Takahashi, Rion
    Tamura, Junji
    2016 19TH INTERNATIONAL CONFERENCE ON ELECTRICAL MACHINES AND SYSTEMS (ICEMS 2016), 2016,
  • [46] Fuzzy Modeling of Uncertainties in Generation Scheduling Integrating Wind Farms and Pumped Storage Plants
    Siahkali, H.
    Mokhtary, M.
    Ahmadi, F.
    2011 ASIA-PACIFIC POWER AND ENERGY ENGINEERING CONFERENCE (APPEEC), 2011,
  • [47] Human effects on long-distance wind dispersal and colonization by grassland plants
    Soons, MB
    Nathan, R
    Katul, GG
    ECOLOGY, 2004, 85 (11) : 3069 - 3079
  • [48] Contribution of a pumped-storage hydropower plant to reduce the scheduling costs of an isolated power system with high wind power penetration
    Perez-Diaz, Juan I.
    Jimenez, Javier
    ENERGY, 2016, 109 : 92 - 104
  • [49] An MILP-based model for short-term peak shaving operation of pumped-storage hydropower plants serving multiple power grids
    Cheng, Chuntian
    Su, Chengguo
    Wang, Peilin
    Shen, Jianjian
    Lu, Jianyu
    Wu, Xinyu
    ENERGY, 2018, 163 : 722 - 733
  • [50] On Issues of Large-Scale and Long-Distance Transmission of Wind Power
    By Wang Ningbo Wind Power Technology Center of Gansu Electric Power Corporation Han Ruiguo
    Electricity, 2011, 22 (02) : 41 - 44