Optimization model for long-distance integrated transmission of wind farms and pumped-storage hydropower plants

被引:70
|
作者
Su, Chengguo [1 ]
Cheng, Chuntian [1 ]
Wang, Peilin [2 ]
Shen, Jianjian [1 ]
Wu, Xinyu [1 ]
机构
[1] Dalian Univ Technol, Inst Hydropower & Hydroinformat, Dalian 116024, Peoples R China
[2] Yellow River Conservancy Tech Inst, Sch Hydraul Engn, Kaifeng 475004, Peoples R China
基金
中国国家自然科学基金;
关键词
Integrated transmission; Wind farm; Pumped-storage hydropower plant; Wind power forecast errors; Mixed-integer linear programming; POWER; ENERGY; GENERATION; OPERATION; TECHNOLOGIES;
D O I
10.1016/j.apenergy.2019.03.080
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Long-distance and large-capacity wind power transmission from western and northern China to load centers through ultra-high voltage (UHV) transmission lines is an important and effective measure for large-scale wind power accommodation in China. This paper proposes a novel practical integrated transmission mode for a wind farm (WF) and a pumped-storage hydropower plant (PSHP). In order to cope with additional imbalance costs caused by deviations from the submitted day-ahead schedule and increase the total operational profit, an optimization model for the integrated transmission of a WF and a PSHP has been formulated. The forecast errors for wind power generation are modeled by a scenario analysis technique. Hydraulic constraints and the head effect on the performance of each pumped-storage hydropower unit (PSHU) in both generating and pumping modes have been considered. Through incorporating the nonlinearities, including constraints on the operation status of units and turbine performance curves, the model is converted into a mixed-integer linear programming (MILP) formulation using piecewise linear approximation techniques. Case studies demonstrate that the integrated transmission of the WF and PHSP can efficiently alleviate the negative effect of wind power fluctuations and significantly increase profit. Sensitivity analyses have been carried out to evaluate the effect of the penalty factor for energy imbalance and the electricity price mechanism in the receiving-end power grid on the overall performance of the WF-PSHP union.
引用
收藏
页码:285 / 293
页数:9
相关论文
共 50 条
  • [1] Can pumped-storage hydropower plants be a strategic reserve?
    Können Pumpspeicherkraftwerke eine strategische Reserve sein?
    Bergmann, H., 1600, Friedr. Vieweg und Sohn Verlags GmbH (104): : 7 - 8
  • [2] Trends and challenges in the operation of pumped-storage hydropower plants
    Perez-Diaz, Juan I.
    Chazarra, M.
    Garcia-Gonzalez, J.
    Cavazzini, G.
    Stoppato, A.
    RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2015, 44 : 767 - 784
  • [3] Optimization Model for Design-Operation of Pumped-Storage and Hydropower Systems
    Bozorg-Haddad, Omid
    Ashofteh, Parisa-Sadat
    Rasoulzadeh-Gharibdousti, Solmaz
    Marino, Miguel A.
    JOURNAL OF ENERGY ENGINEERING, 2014, 140 (02)
  • [4] Optimal Hourly Scheduling for Wind-Hydropower Systems with Integrated Pumped-Storage Technology
    Xu, Jiuping
    Liu, Tingting
    JOURNAL OF ENERGY ENGINEERING, 2021, 147 (03)
  • [5] Real-time optimization of wind farms and fixed-head pumped-storage hydro-plants
    Bayon, L.
    Grau, J. M.
    Ruiz, M. M.
    Suarez, P. M.
    INTERNATIONAL JOURNAL OF COMPUTER MATHEMATICS, 2013, 90 (10) : 2147 - 2160
  • [6] Cross-regional integrated transmission of wind power and pumped-storage hydropower considering the peak shaving demands of multiple power grids
    Yuan, Wenlin
    Xin, Wenpeng
    Su, Chengguo
    Cheng, Chuntian
    Yan, Denghua
    Wu, Zening
    RENEWABLE ENERGY, 2022, 190 : 1112 - 1126
  • [7] FREQUENCY STARTING IN PUMPED-STORAGE PLANTS - POSSIBILITIES AND OPTIMIZATION
    BOSE, B
    CANAY, M
    SIMOND, JJ
    BROWN BOVERI REVIEW, 1983, 70 (7-8): : 295 - 302
  • [8] A joint daily operational optimization model for wind power and pumped-storage plant
    Hu, Zechun
    Ding, Huajie
    Kong, Tao
    Dianli Xitong Zidonghua/Automation of Electric Power Systems, 2012, 36 (02): : 36 - 41
  • [9] An efficient, robust optimization model for the unit commitment considering renewable uncertainty and pumped-storage hydropower*
    Nasab, Morteza Azimi
    Zand, Mohammad
    Padmanaban, Sanjeevikumar
    Bhaskar, Mahajan Sagar
    Guerrero, Josep M.
    COMPUTERS & ELECTRICAL ENGINEERING, 2022, 100
  • [10] Simulation and size optimization of a pumped-storage power plant for the recovery of wind-farms rejected energy
    Anagnostopoulos, J. S.
    Papantonis, D. E.
    RENEWABLE ENERGY, 2008, 33 (07) : 1685 - 1694