共 50 条
- [41] Scheduling jobs with uncertain setup times and sequence dependency OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1997, 25 (04): : 437 - 447
- [45] A heuristic algorithm to minimize total weighted tardiness on a single machine with release dates and sequence-dependent setup times Journal of the Chinese Institute of Industrial Engineers, 2004, 21 (03): : 289 - 300
- [46] Permutation flowshop manufacturing cell scheduling problems with deteriorating jobs and sequence dependent setup times under dominant machines Optimization Letters, 2021, 15 : 537 - 551
- [50] Scheduling Jobs on Parallel Machines with Sequence-Dependent Setup Times, Precedence Constraints, and Ready Times Using Variable Neighborhood Search CIE: 2009 INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2009, : 273 - 278