共 50 条
- [32] Clear-Water Scour at Pile Groups [J]. JOURNAL OF HYDRAULIC ENGINEERING, 2013, 139 (10) : 1089 - 1098
- [34] Application of an evolutionary technique (PSO-SVM) and ANFIS in clear-water scour depth prediction around bridge piers [J]. NEURAL COMPUTING & APPLICATIONS, 2019, 31 (11): : 7335 - 7349
- [37] Clear-water pier and abutment scour [J]. HYDRAULICS OF RIVERS, WATER WORKS AND MACHINERY, VOL 1, THEME D, PROCEEDINGS: 21ST CENTURY: THE NEW ERA FOR HYDRAULIC RESEARCH AND ITS APPLICATIONS, 2001, : 7 - 12
- [38] Roughened bridge piers as a scour countermeasure under clear water conditions [J]. ISH Journal of Hydraulic Engineering, 2019, 25 (01): : 94 - 103
- [40] Equilibrium clear-water scour around an abutment [J]. JOURNAL OF HYDRAULIC ENGINEERING-ASCE, 1997, 123 (03): : 237 - 243