Flexible management of repetitive construction processes by an intelligent support system

被引:14
|
作者
Hajdasz, Magdalena [1 ]
机构
[1] Poznan Univ Tech, PL-60965 Poznan, Poland
关键词
Artificial intelligence; Expert systems; Construction process; Modeling and simulation; Repetitive construction projects; Knowledge management; EXPERT-SYSTEM; SIMULATION; VISUALIZATION; KNOWLEDGE;
D O I
10.1016/j.eswa.2013.06.063
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Constant advances in construction planning and site management are crucial to improving construction productivity. This paper presents an intelligent system MoCCAS (a monolithic construction computer aided system), which is a comprehensive decision support tool for flexible construction site management in repetitive projects. MoCCAS aids the construction site manager in developing optimal and attainable execution scenarios by providing contextualized variants of construction strategies. The discussion is centered on the modeling procedures of repetitive processes with the special focus on the synchronization of resources and workflow continuity, which is crucial in scheduling and managing repetitive projects. The paper introduces an innovative conceptualization of the construction process and presents a dynamic three-dimensional construction process model in a temporal perspective. How the system synchronizes the work of resources combined into a balanced production sets and also supports the decision maker in creating what-if scenarios in designing execution strategies is discussed. (C) 2013 Elsevier Ltd. All fights reserved.
引用
收藏
页码:962 / 973
页数:12
相关论文
共 50 条
  • [21] An intelligent decision support system for management of floods
    Ahmad, Sajjad
    Simonovic, Slobodan P.
    WATER RESOURCES MANAGEMENT, 2006, 20 (03) : 391 - 410
  • [22] Flexible Task Management Support for Knowledge-Intensive Processes
    Mundbrod, Nicolas
    Reichert, Manfred
    PROCEEDINGS OF THE 2017 IEEE 21ST INTERNATIONAL ENTERPRISE DISTRIBUTED OBJECT COMPUTING CONFERENCE (EDOC 2017), 2017, : 95 - 102
  • [23] Intelligent Materials Tracking System for Construction Projects Management
    Kasim, Narimah
    JOURNAL OF ENGINEERING AND TECHNOLOGICAL SCIENCES, 2015, 47 (02): : 218 - 230
  • [24] Organization of management's construction and providing processes in the management system of construction enterprise
    Stupakova, Olga
    Sokolnikov, Vyacheslav
    Osipenkova, Irina
    Nurgalina, Rosa
    INTERNATIONAL SCIENCE CONFERENCE SPBWOSCE-2017 BUSINESS TECHNOLOGIES FOR SUSTAINABLE URBAN DEVELOPMENT, 2018, 170
  • [25] Artificial intelligent support model for multiple criteria decision in construction management
    Son, Pham Vu Hong
    Khoi, Luu Ngoc Quynh
    OPSEARCH, 2024, 61 (4) : 2218 - 2241
  • [26] Database management system support for architecture with intelligent memories
    Gejdos, I
    Ben Miled, Z
    Liu, J
    Bukhres, O
    PARALLEL AND DISTRIBUTED COMPUTING SYSTEMS, 2002, : 199 - 205
  • [27] An Automatic and Intelligent System for Integrated Healthcare Processes Management
    Cid-de-la-Paz, Virginia
    Jimenez-Ramirez, Andres
    Escalona, M. J.
    BIOINFORMATICS AND BIOMEDICAL ENGINEERING, IWBBIO 2017, PT II, 2017, 10209 : 621 - 630
  • [28] AN INTELLIGENT INTERACTIVE PROJECT-MANAGEMENT SUPPORT SYSTEM
    JUNGEN, FJ
    KOWALCZYK, W
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1995, 84 (01) : 60 - 81
  • [29] Intelligent Decision Support System for River Floodplain Management
    Wriggers, Peter
    Kultsova, Marina
    Kapysh, Alexander
    Kultsov, Anton
    Zhukova, Irina
    KNOWLEDGE-BASED SOFTWARE ENGINEERING, JCKBSE 2014, 2014, 466 : 195 - 213
  • [30] Intelligent production control decision support system for flexible assembly lines
    Guo, Z. X.
    Wong, W. K.
    Leung, S. Y. S.
    Fan, J. T.
    EXPERT SYSTEMS WITH APPLICATIONS, 2009, 36 (03) : 4268 - 4277