Breakage Probability Calculation of Shield Tunnel under the Effect of Foundation Pit Excavation

被引:2
|
作者
Guan Yong-ping [1 ]
Zhao Wen [1 ]
Xie Xin [1 ]
Li Shen-gang [1 ]
Wang Guo-feng [1 ]
机构
[1] Northeastern Univ, Sch Resource & Civil Engn, Shenyang 110819, Peoples R China
关键词
Foundation pit engineering; construction stage; shield segments; finite element method; quantitative analysis; risk analysis; Monte Carlo; failure probability;
D O I
10.4028/www.scientific.net/AMM.353-356.1475
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The excavation of foundation pit will change the initial stress state in surrounding soils, which induce the superimposed stress and uneven settlement to the adjacent existing tunnels. Based on the pit excavation engineering in Shenyang, which sits atop the existing tunnels, the risk factors and failure type of shield segment lining were studied through risk analysis theory. According to the uncertainty and spatial variability of soil parameters, the risk accident of existing tunnel was calculated by means of stochastic finite element which is combined Monte Carlo simulation with FEM. The risk of existing tunnel during the pit excavation stage was evaluated respectively under multi-failure patterns. The framework is used to estimate and minimize risks at pit excavation engineering in Shenyang.
引用
收藏
页码:1475 / 1479
页数:5
相关论文
共 50 条
  • [41] Analytical investigation of tunnel deformation caused by circular foundation pit excavation
    Sun, Huasheng
    Chen, Yadong
    Zhang, Jihua
    Kuang, Tiesheng
    COMPUTERS AND GEOTECHNICS, 2019, 106 : 193 - 198
  • [42] Research and Prospects Regarding the Effect of Foundation Pit Excavation on an Adjacent Existing Tunnel in Soft Soil
    Ding Z.
    Zhang X.
    Liang F.-Y.
    Cheng D.-J.
    Wang L.-Q.
    Zhongguo Gonglu Xuebao/China Journal of Highway and Transport, 2021, 34 (03): : 50 - 70
  • [43] Design of foundation and excavation engineering considering influence of tunnel shield construction
    Song, Qing-Jun
    Wang, Wei-Dong
    Zhou, Jian
    Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2010, 32 (SUPPL. 2): : 314 - 318
  • [44] Design and computation of deep foundation pit adjacent to shield tunnel of metro
    Chu, Zhen-Huan, 1600, Chinese Society of Civil Engineering (36):
  • [45] Segment opening calculation of shield tunnel based on double-sided elastic foundation beam when tunnel followed by well excavation
    Yang, Chunshan
    Mo, Haihong
    Chen, Junsheng
    Li, Jinhua
    Electronic Journal of Geotechnical Engineering, 2013, 18 Z : 6067 - 6079
  • [46] Simplified calculation method for rebound of large area foundation pit excavation
    Wu, Hao
    Wang, Yijun
    Wang, Hai
    Mao, Zhiwei
    Zhao, Yunqiang
    Fu, Yanbin
    Tumu Gongcheng Xuebao/China Civil Engineering Journal, 2020, 53 : 361 - 366
  • [47] A calculation of behavior of underpinning pile subject to excavation of deep foundation pit
    Yang M.
    Lu J.
    Tongji Daxue Xuebao/Journal of Tongji University, 2010, 38 (12): : 1730 - 1735
  • [48] Foundation Pit Excavation on Surrounding Buildings Effect Analysis
    Zhang Qing
    Cheng Heming
    Gui Yue
    Cao Jing
    MECHATRONICS AND APPLIED MECHANICS II, PTS 1 AND 2, 2013, 300-301 : 950 - 954
  • [49] Effect of Excavation of Foundation Pit on Deformation of Surrounding Buildings
    Li, Changhong
    Luo, Pengfei
    Zhou, Xiaolong
    Wang, Hao
    Wei, Xiaoming
    ELECTRONIC JOURNAL OF GEOTECHNICAL ENGINEERING, 2016, 21 (09): : 2975 - 2984
  • [50] Calculation Method of Lateral Tunnel Displacement Caused by Foundation Pit Excavation Based on Non-Limit Earth Pressure
    Xu, Sifa
    Yu, Junhui
    Guo, Binglai
    Zhang, Yong
    Ye, Fangyu
    Wang, Zhe
    SSRN, 2023,