On the Concerted Design and Scheduling of Multiple Resources for Persistent UAV Operations

被引:40
|
作者
Kim, Jonghoe [1 ]
Morrison, James R. [1 ]
机构
[1] Korea Adv Inst Sci & Technol, Dept Ind & Syst Engn, Taejon 305701, South Korea
基金
新加坡国家研究基金会;
关键词
Persistent UAV service; Concerted design and scheduling; Replenishment stations; Branch and bound algorithms; UAV scheduling for persistence; ASSIGNMENT; SYSTEM;
D O I
10.1007/s10846-013-9958-8
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
A fleet of unmanned aerial vehicles (UAVs) supported by logistics infrastructure, such as automated service stations, may be capable of long-term persistent operations. Typically, two key stages in the deployment of such a system are resource selection and scheduling. Here, we endeavor to conduct both of these phases in concert for persistent UAV operations. We develop a mixed integer linear program (MILP) to formally describe this joint design and scheduling problem. The MILP allows UAVs to replenish their energy resources, and then return to service, using any of a number of candidate service station locations distributed throughout the field. The UAVs provide service to known determin-istic customer space-time trajectories. There may be many of these customer missions occurring simultaneously in the time horizon. A customer mission may be served by several UAVs, each of which prosecutes a different segment of the customer mission. Multiple tasks may be conducted by each UAV between visits to the service stations. The MILP jointly determines the number and locations of resources (design) and their schedules to provide service to the customers. We address the computational complexity of the MILP formulation via two methods. We develop a branch and bound algorithm that guarantees an optimal solution and is faster than solving the MILP directly via CPLEX. This method exploits numerous properties of the problem to reduce the search space. We also develop a modified receding horizon task assignment heuristic that includes the design problem (RHTA(d)). This method may not find an optimal solution, but can find feasible solutions to problems for which the other methods fail. Numerical experiments are conducted to assess the performance of the RHTA(d) and branch and bound methods relative to the MILP solved via CPLEX. For the experiments conducted, the branch and bound algorithm and RHTA(d) are about 500 and 25,000 times faster than the MILP solved via CPLEX, respectively. While the branch and bound algorithm obtains the same optimal value as CPLEX, RHTA(d) sacrifices about 5.5 % optimality on average.
引用
收藏
页码:479 / 498
页数:20
相关论文
共 50 条
  • [1] On the concerted design and scheduling of multiple resources for persistent UAV operations
    Kim, Jonghoe
    Morrison, James R.
    [J]. 2013 INTERNATIONAL CONFERENCE ON UNMANNED AIRCRAFT SYSTEMS (ICUAS), 2013, : 942 - 951
  • [2] On the Concerted Design and Scheduling of Multiple Resources for Persistent UAV Operations
    Jonghoe Kim
    James R. Morrison
    [J]. Journal of Intelligent & Robotic Systems, 2014, 74 : 479 - 498
  • [3] Operations scheduling with multiple resources and transportation considerations
    Lee, Kangbok
    Lei, Lei
    Pinedo, Michael
    Wang, Shengbin
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2013, 51 (23-24) : 7071 - 7090
  • [4] Emergency supply chain scheduling problem with multiple resources in disaster relief operations
    Ghaffari, Zahra
    Nasiri, Mohammad Mahdi
    Bozorgi-Amiri, Ali
    Rahbari, Ali
    [J]. Transportmetrica A: Transport Science, 2020, 16 (03): : 930 - 956
  • [5] Scheduling operations for the harvesting of renewable resources
    Foulds, LR
    Wilson, JM
    [J]. JOURNAL OF FOOD ENGINEERING, 2005, 70 (03) : 281 - 292
  • [6] Task scheduling system for UAV operations in indoor environment
    Khosiawan, Yohanes
    Park, Youngsoo
    Moon, Ilkyeong
    Nilakantan, Janardhanan Mukund
    Nielsen, Izabela
    [J]. NEURAL COMPUTING & APPLICATIONS, 2019, 31 (09): : 5431 - 5459
  • [7] Probabilistic allocation and scheduling of multiple resources for emergency operations; a Victorian bushfire case study
    Bodaghi, Behrooz
    Palaneeswaran, Ekambaram
    Shahparvari, Shahrooz
    Mohammadi, Mahsa
    [J]. COMPUTERS ENVIRONMENT AND URBAN SYSTEMS, 2020, 81
  • [8] Task scheduling system for UAV operations in indoor environment
    Yohanes Khosiawan
    Youngsoo Park
    Ilkyeong Moon
    Janardhanan Mukund Nilakantan
    Izabela Nielsen
    [J]. Neural Computing and Applications, 2019, 31 : 5431 - 5459
  • [9] Holistic Design Parameter Optimization of Multiple Periodic Resources in Hierarchical Scheduling
    Yoon, Man-Ki
    Kim, Jung-Eun
    Bradford, Richard
    Sha, Lui
    [J]. DESIGN, AUTOMATION & TEST IN EUROPE, 2013, : 1313 - 1318
  • [10] Hierarchical scheduling method of UAV resources for emergency surveying
    Zhang, Junxiao
    Zhu, Qing
    Shen, Fuqiang
    Miao, Shuangxi
    Cao, Zhenyu
    Weng, Qiqiang
    [J]. INTERNATIONAL CONFERENCE ON INTELLIGENT EARTH OBSERVING AND APPLICATIONS 2015, 2015, 9808