共 50 条
- [41] Improving Construction Management of an Educational Center by Applying Earned Value Technique PROCEEDINGS OF THE TWELFTH EAST ASIA-PACIFIC CONFERENCE ON STRUCTURAL ENGINEERING AND CONSTRUCTION (EASEC12), 2011, 14
- [45] The research on optimization of earned value management method in engineering budget management Open Civ. Eng. J., 1 (369-375):
- [47] The research on optimization of earned value management method in engineering budget management Open Civil Engineering Journal, 2015, 9 (01): : 369 - 375
- [50] THE PENNY-SHAPED CRACK AND THE PLANE-STRAIN CRACK IN AN INFINITE BODY OF POWER-LAW MATERIAL JOURNAL OF APPLIED MECHANICS-TRANSACTIONS OF THE ASME, 1981, 48 (04): : 830 - 840