MODEL BASED PERFORMANCE CORRECTION METHODOLOGY - A CASE STUDY

被引:0
|
作者
Zuniga, Koldo [1 ]
Schmitt, Thomas P. [2 ]
Clement, Herve [3 ]
Balaco, Joao [1 ]
机构
[1] GE Co, Power & Water, Glasgow, Lanark, Scotland
[2] GE Co, Power & Water, Fairview, NC USA
[3] GE Co, Power & Water, Belfort, France
关键词
D O I
暂无
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Correction curves are of great importance in the performance evaluation of heavy duty gas turbines (HDGT). They provide the means by which to translate performance test results from test conditions to the rated conditions. The correction factors are usually calculated using the original equipment manufacturer (OEM) gas turbine thermal model (a.k.a. cycle deck), varying one parameter at a time throughout a given range of interest. For some parameters bi-variate effects are considered when the associated secondary performance effect of another variable is significant. Although this traditional approach has been widely accepted by the industry, has offered a simple and transparent means of correcting test results, and has provided a reasonably accurate correction methodology for gas turbines with conventional control systems, it neglects the associated interdependence of each correction parameter from the remaining parameters. Also, its inherently static nature is not well suited for today's modern gas turbine control systems employing integral gas turbine aero-thermal models in the control system that continuously adapt the turbine's operating parameters to the "as running" aero-thermal component performance characteristics. Accordingly, the most accurate means by which to correct the measured performance from test conditions to the guarantee conditions is by use of Model-Based Performance Corrections, in agreement with the current PTC-22 and ISO 2314, although not commonly used or accepted within the industry. The implementation of Model-based Corrections is presented for the Case Study of a GE 9FA gas turbine upgrade project, with an advanced model-based control system that accommodated a multitude of operating boundaries. Unique plant operating restrictions, coupled with its focus on partial load heat rate, presented a perfect scenario to employ Model-Based Performance Corrections.
引用
收藏
页数:5
相关论文
共 50 条
  • [21] Case study for a performance based rapid seismic assessment methodology (PERA2019) based on actual earthquake damages
    Hasan Huseyin Aydogdu
    Alper Ilki
    Bulletin of Earthquake Engineering, 2024, 22 : 1965 - 1999
  • [22] Using a model of the performance measures in Soft Systems Methodology (SSM) to take action: a case study in health care
    Kotiadis, K.
    Tako, A. A.
    Rouwette, E. A. J. A.
    Vasilakis, C.
    Brennan, J.
    Gandhi, P.
    Wegstapel, H.
    Sagias, F.
    Webb, P.
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2013, 64 (01) : 125 - 137
  • [23] On case study methodology
    Johansson, Rolf
    OPEN HOUSE INTERNATIONAL, 2007, 32 (03) : 48 - 54
  • [24] Performance Improvement of Predictive Control Based on Model Mismatch Correction
    Huang, Zhen
    Li, Lijuan
    2019 CHINESE AUTOMATION CONGRESS (CAC2019), 2019, : 4506 - 4511
  • [25] A novel methodology for performance evaluation of IT projects in a fuzzy environment: a case study
    Basar, Ayfer
    SOFT COMPUTING, 2020, 24 (14) : 10755 - 10770
  • [26] A novel methodology for performance evaluation of IT projects in a fuzzy environment: a case study
    Ayfer Basar
    Soft Computing, 2020, 24 : 10755 - 10770
  • [27] A case study extension methodology for performance measurement diagnosis in nonprofit organizations
    Almeida Prado Cestari, Jose Marcelo
    de Lima, Edson Pinheiro
    Deschamps, Fernando
    Van Aken, Eileen Morton
    Treinta, Fernanda
    Moura, Louisi Francis
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2018, 203 : 225 - 238
  • [28] A Structured Methodology for the Safety Key Performance Indicator Prioritization: A Case Study
    La Fata, C. M.
    Giallanza, A.
    Micale, R.
    La Scalia, G.
    2021 5TH INTERNATIONAL CONFERENCE ON SYSTEM RELIABILITY AND SAFETY (ICSRS 2021), 2021, : 143 - 147
  • [29] Assessment of performance and dependability in embedded control systems: Methodology and case study
    Short, Michael
    Pont, Michael J.
    Fang, Jianzhong
    CONTROL ENGINEERING PRACTICE, 2008, 16 (11) : 1293 - 1307