Experimental Investigation of Flow Control Technology for Grouting and Blocking of Flowing Water in Karst Conduits

被引:10
|
作者
Pan, Dongdong [1 ,2 ]
Bu, Zehua [1 ,3 ]
Li, Haiyan [1 ]
Xu, Zhenhao [1 ,3 ]
Liu, Jie [1 ]
机构
[1] Shandong Univ, Geotech & Struct Engn Res Ctr, Jinan 250061, Peoples R China
[2] Shandong Univ, Sch Civil Engn, Jinan 250061, Peoples R China
[3] Shandong Univ, Sch Qilu Transportat, Jinan 250061, Peoples R China
基金
中国国家自然科学基金; 中国博士后科学基金;
关键词
Water inflow; Flow control technology; Flowing water grouting; Blocking mechanism; ROCK; SIMULATION; FRACTURE;
D O I
10.1007/s12205-022-2129-3
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Aiming at the grouting treatment in karst conduits with large flow and high velocity, we developed a simulation experiment system for conduit-type grouting blocking and investigated the blocking mechanism of flowing water grouting under the condition of flow control. Firstly, we studied the effect of flow control in conduit by controlling the opening of outlet valve and analyzed the variation law of velocity and pressure in conduits under different water heads, conduit diameters and valve opening quantitatively. Secondly, we conducted experiments of flowing water grouting under different flow control conditions, and revealed the influence law of flow control for flowing water grouting. The results show that: 1) with the increase of the intensity of flow control, the pressure in conduit increased gradually, and the velocity of flowing water decreased gradually. 2) When the volume ratio of water and cement was 1.2:1, the volume ratio of cement and sodium silicate was 2:1, the grouting volume was 540 L/h, and the flowing water velocity was 0.15 m/s, flowing water blocking under the condition of flow control achieved the optimal effect. 3) With flow control, the slurry deposition thickness increased more than 50% compared with no flow control; besides, the slurry retention rate increased, and the blocking effect significantly improved. The technology has been successfully applied in the grouting treatment project of China Resources Cement (Pingnan) Limestone Mine. And main water inflow points in the mine were blocked with an total amount of similar to 210,200 m(3)/d water reduction. This study provided some theoretical guidance and reference experience for treatment engineering of water inflow in karst area.
引用
收藏
页码:3440 / 3454
页数:15
相关论文
共 50 条
  • [21] The Grouting Technology of Large -section Highway Tunnel in Water-rich Karst Formations
    Zhou, Chao-Yue
    Fang, Yong
    Fu, Ya-Peng
    Cui, Ge
    CIVIL, STRUCTURAL AND ENVIRONMENTAL ENGINEERING, PTS 1-4, 2014, 838-841 : 1441 - +
  • [22] Experimental Investigation of sample preparation and grouting technology on microbially reinforced tailings
    Lu, Ting
    Wei, Zuoan
    Wang, Wensong
    Yang, Yonghao
    Cao, Guansen
    Wang, Ya
    Liao, Haidong
    CONSTRUCTION AND BUILDING MATERIALS, 2021, 312
  • [23] Experiment and application for grouting materials for karst under conditions of underground water flow before shield tunneling
    Zhang C.
    Yang J.
    Xie Y.
    Gong F.
    Liang X.
    Lei J.
    Su B.
    Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2018, 37 (09): : 2120 - 2130
  • [24] Control of Ground Uplift Based on Flow-Field Regularity during Grouting in Fracture with Flowing Groundwater
    Zheng, Zhuo
    Liu, Rentai
    Li, Shucai
    Yang, Honglu
    INTERNATIONAL JOURNAL OF GEOMECHANICS, 2020, 20 (03)
  • [26] Experimental investigation of stabilization of flowing water temperature with a water-PCM heat exchanger
    Charvat, Pavel
    Stetina, Josef
    Pech, Ondrej
    Klimes, Lubomir
    Ostry, Milan
    EFM13 - EXPERIMENTAL FLUID MECHANICS 2013, 2014, 67
  • [27] Research on water control technology of precise grouting in thick sandstone water damage in Huanglong coalfield
    Feng J.
    Zhang B.
    Shi S.
    Huang F.
    Kang Y.
    Zhang X.
    Meitan Kexue Jishu/Coal Science and Technology (Peking), 2023, 51 : 256 - 264
  • [28] Experimental Investigation on the Grouting Performance of Foam-CNT Composite Grouts in Vertical Inclined Fractures Under Flowing Condition
    Liu, Yaohui
    Lv, Fang
    Ouyang, Zebin
    Wang, Tao
    LITHOSPHERE, 2024, 2024 (01)
  • [29] Grouting sealing method of flow-control speed-down in karst pipelines and its engineering application
    Li, Haiyan
    Liu, Jie
    Wu, Jing
    Xu, Zhenhao
    Zhang, Xiangyu
    Zhang, Lewen
    Li, Zhaofeng
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2021, 108
  • [30] Experimental Investigation of the Pressure and Water Pressure Responses of an Inclined Shaft Wall During Grouting
    Zhang, Galling
    Yuan, Shichong
    Sui, Wanghua
    Qian, Ziwei
    MINE WATER AND THE ENVIRONMENT, 2020, 39 (02) : 256 - 267