Use of Global Visual Acuity Data in a Time Trade-off Approach to Calculate the Cost Utility of Cataract Surgery

被引:35
|
作者
Lansingh, Van C. [2 ,3 ]
Carter, Marissa J. [1 ]
机构
[1] Strateg Solut Inc, Cody, WY 82414 USA
[2] Fdn Hugo Nano, Buenos Aires, DF, Argentina
[3] Fdn Vis, Asuncion, Paraguay
关键词
WILLINGNESS-TO-PAY; EYE CARE PROGRAM; INTRAOCULAR-LENS; UNITED-STATES; OUTCOMES; HEALTH; PHACOEMULSIFICATION; EXTRACTION; QUALITY; LIFE;
D O I
10.1001/archophthalmol.2009.113
中图分类号
R77 [眼科学];
学科分类号
100212 ;
摘要
Objective: To determine the cost utility of cataract surgery worldwide using visual acuity (VA) outcomes and utility values determined by the time trade-off (TTO) method. Data Sources: Some cost data were taken from a previous search conducted for 1995 to 2006 and we searched MEDLINE and Scopus and Google for more recent data (2006 and 2007). Study Selection: Articles were identified from the literature using "cataract surgery" in combination with the terms outcome or visual acuity. Additional searches were conducted using individual countries as a term in combination with VA, outcome, or cost. Regression curves were constructed from utility values derived from a TTO study and VA data. Gains in quality-adjusted life-years (QALYs) were calculated based on life expectancy tables from the World Health Organization and discounts of 3% for both cost and benefit. Sensitivity analyses explored the effect of changes in discounting, life expectancy, preoperative VA, and cost. Data Extraction: If the data were usable, they were kept; otherwise they were discarded. Data Synthesis: Preoperative VA (logMAR) correlated with increasing gross national income per capita (Pearson correlation coefficient, -0.784; P<.001) and showed that in developing countries preoperative vision is much poorer compared with developed countries. Cost utility data ranged from $3.5 to $834/QALY in developing countries to $159 to $1356/QALY in developed countries. Sensitivity analysis showed that changing life expectancy, VA, and discount rate resulted in moderate changes. Conclusions: The TTO approach demonstrates that cataract surgery is extremely cost-effective.
引用
收藏
页码:1183 / 1193
页数:11
相关论文
共 50 条
  • [1] Use of Global Visual Acuity Data in a Time Trade-off Approach to Calculate the Cost Utility of Cataract Surgery Methodological Issues of Cost-Utility Comparisons
    Frick, Kevin D.
    Massof, Robert W.
    [J]. ARCHIVES OF OPHTHALMOLOGY, 2009, 127 (09) : 1205 - 1206
  • [2] Use of Global Visual Acuity Data in a Tune Trade-off Approach to Calculate the Cost Utility of Cataract Surgery (vol 127, pg 1183, 2009)
    Lansingh
    Carter
    [J]. ARCHIVES OF OPHTHALMOLOGY, 2009, 127 (12) : 1609 - 1609
  • [3] Time Trade-off Utility Analysis for Surgical Intervention in Comitant Strabismus, Glaucoma, and Cataract
    Kishimoto, Fumiko
    Naito, Tomoko
    Hasebe, Satoshi
    Ohtsuki, Hiroshi
    [J]. ACTA MEDICA OKAYAMA, 2012, 66 (03) : 191 - 201
  • [4] Time and cost trade-off management for scheduling parallel applications on Utility Grids
    Garg, Saurabh Kumar
    Buyya, Rajkumar
    Siegel, Howard Jay
    [J]. FUTURE GENERATION COMPUTER SYSTEMS-THE INTERNATIONAL JOURNAL OF GRID COMPUTING-THEORY METHODS AND APPLICATIONS, 2010, 26 (08): : 1344 - 1355
  • [5] Project time–cost trade-off scheduling: a hybrid optimization approach
    Hadi Mokhtari
    Abdollah Aghaie
    Javad Rahimi
    Ashkan Mozdgir
    [J]. The International Journal of Advanced Manufacturing Technology, 2010, 50 : 811 - 822
  • [6] A reduction tree approach for the Discrete Time/Cost Trade-Off Problem
    Van Eynde, Rob
    Vanhoucke, Mario
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2022, 143
  • [7] Project time-cost trade-off scheduling: a hybrid optimization approach
    Mokhtari, Hadi
    Aghaie, Abdollah
    Rahimi, Javad
    Mozdgir, Ashkan
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 50 (5-8): : 811 - 822
  • [8] A genetic algorithm approach for the time-cost trade-off in PERT networks
    Azaron, A
    Perkgoz, C
    Sakawa, M
    [J]. APPLIED MATHEMATICS AND COMPUTATION, 2005, 168 (02) : 1317 - 1339
  • [9] Stochastic Time-Cost-Quality Trade-Off Analysis: The PERT Approach
    Hosny, Ossama
    Elbassuony, Mahmoud
    [J]. CONSTRUCTION RESEARCH CONGRESS 2018: CONSTRUCTION PROJECT MANAGEMENT, 2018, : 346 - 355
  • [10] Time-Cost Trade-Off Optimization with a New Initial Population Approach
    Togan, Vedat
    Eirgas, Mohammad Azim
    [J]. TEKNIK DERGI, 2019, 30 (06): : 9561 - 9580