共 50 条
- [1] Model of iron and steel enterprises group strategy production scheduling and planning based on theory of hierarchical optimization [J]. Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2007, 13 (05): : 833 - 838
- [2] Architecture and application of CIMS for iron and steel enterprises group [J]. Jisuanji Jicheng Zhizao Xitong, 2006, 9 (1411-1416):
- [3] Group of the enterprises 'Steel construction' [J]. Montazhnye i Spetsial'nye Raboty v Stroitel'stve, 2002, (07): : 18 - 19
- [4] Steelmaking-Hot Rolling Scheduling Model and Method for Integrated Management in Iron and Steel Enterprises [J]. ENERGY DEVELOPMENT, PTS 1-4, 2014, 860-863 : 3094 - 3099
- [5] Research on the cooperated optimization model of energy in iron and steel enterprises [J]. PROCEEDINGS OF THE 2015 JOINT INTERNATIONAL MECHANICAL, ELECTRONIC AND INFORMATION TECHNOLOGY CONFERENCE (JIMET 2015), 2015, 10 : 624 - 630
- [6] Strategic research of coal enterprises' group [J]. MINE PLANNING AND EQUIPMENT SELECTION 1998, 1998, : 441 - 443
- [7] Research on Safety Supervision Model of Shanxi Group Coal Enterprises [J]. INTERNATIONAL SYMPOSIUM ON SAFETY SCIENCE AND ENGINEERING IN CHINA, 2012, 2012, 43 : 499 - 505
- [9] Optimization Production Plan for Iron and Steel Enterprises [J]. 2012 7TH INTERNATIONAL CONFERENCE ON SYSTEM OF SYSTEMS ENGINEERING (SOSE), 2012, : 609 - 611
- [10] On production logistics planning for iron and steel enterprises [J]. Proceedings of 2005 Chinese Control and Decision Conference, Vols 1 and 2, 2005, : 1695 - 1699